Ft. Campbell Rectifier Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, U.S. Army Corps of Engineers (USACE), through its Louisville District, is soliciting proposals for a turnkey solution to replace obsolete DC power plant systems at Fort Campbell, KY. This project, titled "Ft. Campbell Rectifier Replacement," involves replacing rectifiers and inverters that are past their useful service life. This is an Unrestricted solicitation, and proposals will be evaluated on a Lowest Price Technically Acceptable (LPTA) basis. The proposal due date is April 24, 2026.
Scope of Work
The selected contractor will provide all necessary personnel, equipment, tools, materials, supervision, and transportation for the complete replacement of DC power plant systems. This includes furnishing and installing new inverter modules, DC disconnects, AC conduits, conductors, circuit breakers, rectifiers, RPM modules, and battery monitoring probes. The contractor will also be responsible for transferring power connections from existing to new systems, disconnecting and removing existing components, and performing initial acceptance testing. Work will be performed across multiple buildings at Ft. Campbell RNEC, including 95, 2579, 6079, 6642, 7030, B7254, and 7943. Facility plans are provided to detail the physical scope and site-specific requirements.
Contract Details
- Contract Type: Firm Fixed Price
- NAICS Code: 335999 (All Other Miscellaneous Electrical Equipment and Component Manufacturing)
- Size Standard: 600 employees
- Period of Performance: 365 days from the date of award
- Place of Performance: Fort Campbell, KY
- Payment: Electronic Funds Transfer (EFT) upon acceptance of completed work and final invoice.
- Warranty: All work, labor, and equipment warrantied for 1-year from completion.
- Liquidated Damages: $337 per day will be assessed for project delays beyond the contract completion date.
Set-Aside
This acquisition is Unrestricted.
Evaluation
Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Offerors must have an active registration in SAM.gov and complete their Representations and Certifications.
Key Dates & Actions
- Site Visit: April 15, 2026, at 1300 EDT at 95 Bastogne Ave, Fort Campbell, KY 42223. Attendees must enter through the Visitor Center at Gate 4 with a valid Real ID/Passport.
- Proposal Due Date: April 24, 2026, at 17:00 ET.
- Contractor Qualifications: Minimum 10 years experience installing similar DC Plant/Inverter systems and 5 years experience with high-reliability, data center environments (Tier III or IV).
- Compliance: Adherence to Federal, State, and Local laws, EM 385-1-1 safety standards, and NIST SP 800-171 for Controlled Unclassified Information (CUI).
- Labor: Compliance with the Service Contract Act wage determinations for Kentucky and Tennessee counties.
Additional Notes
Contractor employees require escort by a facility representative and must comply with installation/facility access and local security policies, including AT Level I, OPSEC Level I, and iWATCH Army Training.