Furniture F20016 Conference RM

SOL #: FA860126Q0043Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8601 AFLCMC PZIO
WRIGHT PATTERSON AFB, OH, 45433-5344, United States

Place of Performance

Wright Patterson AFB, OH

NAICS

Office Furniture (except Wood) Manufacturing (337214)

PSC

Office Furniture (7110)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 16, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
May 12, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for Furniture for Conference Room F20016 at Wright-Patterson Air Force Base, OH. This combined synopsis/solicitation seeks a Firm Fixed Price (FFP) contract for the supply, design, and installation of various office furniture items. Quotes are due May 12, 2026, at 4:00 PM EST.

Scope of Work

This requirement, under NAICS 337214 (Office Furniture Manufacturing), includes the provision and installation of:

  • 1 Workstation (30" x 84")
  • 15 Mobile Fliptop Tables (24" x 54")
  • 18 Conference Chairs
  • 42 Upholstered Seat Mesh Back Stack Chairs
  • 3 Stack Chair Dollies
  • 1 Buffet Credenza (24” x 72”)
  • Design services, including programming, space planning, product specification, and 3D renderings.
  • Freight, receiving, delivery, and installation services, including electrical hook-up by a certified electrician.
  • Installation must be performed by manufacturer-certified professionals, with protection of existing building materials.
  • Compliance with 88 CS Telecommunication Requirements.
  • Personnel requirements include a Contract Manager and Project Manager with at least 3 years of experience.
  • Deliverables include final installation AutoCAD dwg file, invoice, updated furniture layouts, and bill of materials.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Procurement Method: Simplified Acquisition Procedures (FAR Part 13)
  • Set-Aside: None
  • Period of Performance: Delivery and installation required within 120 days After Receipt of Order (ARO).
  • Quotes Due: May 12, 2026, at 4:00 PM EST
  • RFIs Due: April 27, 2026, at 4:00 PM EST
  • Quote Acceptance: Offerors must hold prices firm for 120 calendar days.
  • Evaluation: Lowest Price Technically Acceptable (LPTA) quotation that conforms to requirements and SOW, with a fair and reasonable price. Quotations must include a complete description of equipment.

Submission Requirements

Quotes must be submitted electronically via email to Nasir al-Din Rashid (nasir_al-din.rashid.1@us.af.mil) and Claire Hess (claire.hess@us.af.mil). The email subject line must be "FA860126Q0043, Furniture F20016 Conference RM". The entire quotation, including attachments, must not exceed 5 MB and should not contain compressed (.zip) files. Only .pdf, .doc, .docx, .xls, or .xlsx attachments are permitted.

Site Visit Information

A site visit will be held on Tuesday, May 5, 2026, at 1:00 PM EST at Building 16 (20016) cafeteria, Wright-Patterson AFB. Interested attendees must RSVP by Wednesday, April 29, 2026, at 12:00 PM EST to Nasir Rashid and Claire Hess with required visitor information for a pass. Visitors will need to pick up passes in Area A prior to arriving at Facility 20016 in Area B.

Additional Notes

Firms must be registered in the System for Award Management (SAM.gov) to be considered. A DWG file for this effort is available upon request from the POCs. Shipping/transportation will be FOB: Destination.

People

Points of Contact

Claire HessSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: May 7, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View