FY 25 Wax Plant Electrical Upgrades , B3566

SOL #: W912PL25RA015Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST LOS ANGELES
LOS ANGELES, CA, 90017-3409, United States

Place of Performance

Place of performance not available

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Repair Or Alteration Of Ammunition Facilities (Z2EA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jul 10, 2025
2
Last Updated
Oct 1, 2025
3
Submission Deadline
Aug 11, 2025, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

PIEE update 0001 is issued to transmit the SF30 (754 pages) of Amendment 0001 for the RFP W912PL25RA015. Amendment 0001 does not extend proposal due date. Design Build construction project to complete D-B drawings from 65% to 100% and furnish all materials and labor necessary to install three (3) Wax Mixing, Melting, and Pouring Systems (WMMPS) and two (2) conditioning chambers at Building 3566, Yuma Proving Grounds (YPG). The WMMPS and chambers will be configured primarily to support wax loading of projectile and mortar bodies. The new equipment will replace steam injection with electric resistive heating to directly heat the wax equipment. The current wax equipment, fuel tank, steam generators, and all associated piping shall be removed and disposed. The contractor will increase the available power to accommodate increased demands for electrical service inside of the facility

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 6
Award Notice
Posted: Oct 1, 2025
View
Version 5
Solicitation
Posted: Aug 27, 2025
View
Version 4
Solicitation
Posted: Jul 28, 2025
View
Version 3
Special Notice
Posted: Jul 28, 2025
View
Version 2Viewing
Solicitation
Posted: Jul 22, 2025
Version 1
Solicitation
Posted: Jul 10, 2025
View