FY26 Multiple Location BEQ Spalling Repairs

SOL #: N4008526R9041Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 7, 2026
2
Last Updated
Jun 8, 2026
3
Submission Deadline
Jun 8, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for FY26 Multiple Location BEQ Spalling Repairs at MCB Camp Lejeune, NC. This project involves comprehensive concrete spalling repairs and protective coating application for exterior walkways, stems, and balconies of Bachelor Enlisted Quarters (BEQ) facilities. This is a Total Small Business Set-Aside (FAR 19.5), restricted to General MACC Contractors listed on the General Requirements cover page. Proposals are due June 8, 2026, at 2:00 PM EST.

Scope of Work

The project requires the removal of unsound, loose, or cracked concrete; treatment of exposed reinforcing steel with anti-corrosion coating; and repair of spalls to create a sound and uniform surface. A complete protective coating system, including a non-slip additive, must be applied to all walking surfaces. Work will be performed in occupied buildings (HP195, M430, M435, BB260, BB265, BB270) and must minimize disruption. Detailed instructions for typical spalling repairs, including rebar preparation and patching material specifications, are provided. Contractors are responsible for securing permits, managing debris, and coordinating site access.

Contract Details

  • Type: Combined Synopsis/Solicitation (Construction)
  • Set-Aside: Total Small Business Set-Aside, restricted to specific General MACC Contractors.
  • Estimated Value: Between $5,000,000 and $10,000,000
  • Period of Performance: 720 days after award
  • Liquidated Damages: $880 per Calendar Day
  • Bonds: Required for proposals over $40K (payment bond) and over $150K (bid, payment, performance bonds).
  • Applicable Regulations: Wage Determination NC20260010, EOs 13706 (Paid Sick Leave) and 13658 (Minimum Wage), and Buy American Requirement-Construction Materials Under Trade Agreements.

Submission & Evaluation

  • Proposal Due: June 8, 2026, at 2:00 PM EST
  • RFIs Cut-off: May 25, 2026, by 2:00 PM EST
  • Basis for Award: Lowest Price
  • Proposal Acceptance: 60 days from receipt of offers
  • Proposals must address all line items (ELINs 0001-0006 for options evaluation).
  • Offerors must acknowledge all amendments. Funding is not guaranteed, and no reimbursement for proposal costs will be provided.

Key Updates & Requirements

  • Amendment 0001: A site visit was scheduled for May 18, 2026, at Building M430.
  • Amendment 0003: Clarified that one individual can fulfill the roles of Quality Control Manager (QCM), Superintendent, and Safety and Health Officer (SSHO).
  • Contractors must review the "Contractor Environmental Guide" for compliance with environmental regulations at MCB Camp Lejeune.
  • A Submittal Register outlines all required administrative and technical documentation.

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jun 4, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Jun 3, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 7, 2026
View
FY26 Multiple Location BEQ Spalling Repairs | GovScope