FY26 Multiple Location BEQ Spalling Repairs

SOL #: N4008526R9041Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 7, 2026
2
Last Updated
Jun 8, 2026
3
Submission Deadline
Jun 8, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for FY26 Multiple Location BEQ Spalling Repairs at Camp Lejeune, NC. This is a Total Small Business Set-Aside opportunity, restricted to General MACC Contractors listed on the General Requirements cover page. The project has an estimated cost range of $5,000,000 to $10,000,000. Proposals are due June 8, 2026, at 2:00 PM EST.

Scope of Work

This project involves comprehensive concrete spalling repairs and the application of a new protective coating system to exterior walkways, stems, and balconies for Bachelor Enlisted Quarters (BEQ) facilities across multiple buildings (HP195, M430, M435, BB260, BB265, BB270) at MCB Camp Lejeune. Key tasks include:

  • Surface Preparation & Demolition: Removing unsound, loose, or cracked concrete.
  • Concrete Repair: Treating exposed reinforcing steel with anti-corrosion coating and repairing spalls to a sound, uniform surface. Repair products must meet specific criteria (e.g., 13,000 PSI compressive strength).
  • Protective Coating System: Applying an exterior-grade, elastomeric, UV-stable, water-resistant, vapor-permeable coating (Epoxy, Acrylic, or Urethane based) with a non-slip additive on walking surfaces. Minimum applied thickness of 13 Dry MILS.
  • Work must minimize disruption as buildings will remain occupied.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation (implied construction contract).
  • Period of Performance: 720 days after award.
  • Estimated Cost Range: $5,000,000 to $10,000,000.
  • Liquidated Damages: $880 per Calendar Day.
  • Proposal Due Date: June 8, 2026, at 2:00 PM EST.
  • RFI Cut-off: May 25, 2026, by 2:00 PM EST (answers provided in amendments).
  • Published Date: June 4, 2026.

Eligibility & Evaluation

  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Restriction: Only General MACC Contractors listed on the General Requirements cover page may submit proposals.
  • Basis for Award: Lowest Price.
  • Proposal Acceptance Period: 60 days from receipt of offers.
  • Proposals must be submitted on all line items to avoid rejection.

Additional Notes

  • Amendments: Amendments 0001, 0002, 0003, and 0004 have been issued. Offerors must acknowledge all amendments. Key changes include a scheduled site visit (May 18, 2026) and clarifications on staffing (QCM, Superintendent, SSHO can be one person) and SOW quantity verification.
  • Bond Requirements: Vary based on proposal value (bid, payment, and performance bonds for >$150K).
  • Wage Determination: General Decision Number NC20260010 1/2/2026 (Building) applies.
  • Environmental Compliance: Contractors must adhere to the "Contractor Environmental Guide" for MCB Camp Lejeune, including environmental awareness and EMS training.
  • Funding availability is not guaranteed; no reimbursement for proposal costs will be provided if funds are unavailable.
  • The "Typical Spalling Repairs Details.pdf" provides crucial guidance on repair methods and materials.

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Jun 4, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Jun 3, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 7, 2026
View