GAOA Grout Pond Site Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture, Forest Service is soliciting quotations for GAOA Grout Pond Site Repairs at the Green Mountain National Forest in Stratton, VT. This project involves the reconstruction and improvement of the Pond Loop Trail and includes optional items for campsite access. This is a Total Small Business Set-Aside opportunity. Quotations are due by April 8, 2026, at 9:00 AM local time.
Scope of Work
This project entails the reconstruction of approximately 4,200 feet of the Pond Loop Trail at Grout Pond Campground. Key deliverables include:
- Base Bid: Construction of 275 feet of new aggregate surface trail, restoration and resurfacing of 3,700 feet of existing trail, reconstruction of 500 feet of trail turnpiking, and installation of a 7'x14' glulam deck bridge.
- Optional Items (A-D): Construction of a 17-step overlapping stone staircase and improved access routes to various campsites and privies, including obliteration of existing routes. These options will be awarded based on funding availability.
The work also involves resurfacing and drainage improvements to enhance visitor access and prevent future degradation.
Contract & Timeline
- Solicitation Type: Combined Synopsis/Solicitation (RFQ) No. 12445526Q0038
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 237999 (Other Heavy and Civil Engineering Construction) with a size standard of $45.0M
- Place of Performance: Stratton, VT
- Period of Performance: May 1, 2026, to September 30, 2026. The contractor must begin performance within 120 calendar days after award and complete work within 1400 calendar days after receiving notice to proceed.
- Quotations Due: April 8, 2026, 9:00 AM local time
- Published Date: March 6, 2026
Submission & Evaluation
Offerors must submit quotations in original and one copy, with envelopes clearly marked with the offeror's name, address, solicitation number, and due date/time. Offers must remain valid for at least 90 calendar days. A performance and payment bond is required within 10 calendar days after award. The agency will consider all responsible quotations.
Additional Notes
- The project is subject to Davis-Bacon Act prevailing wage rates for heavy construction in Windham County, Vermont (GDN VT20260064, published 01/02/2026).
- Compliance with Executive Orders 13706 (paid sick leave) and 13658 (minimum wage) is mandatory.
- Detailed technical specifications for trail construction, materials, and plans are provided in Attachments 4, 5, and 6.
- Primary Contact: Paula Sales (paula.sales@usda.gov)
- Secondary Contact: Brad Higley (bradley.higley@usda.gov)