GAOA Grout Pond Site Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture, Forest Service, Green Mountain National Forest has issued a Combined Synopsis/Solicitation (RFQ) for GAOA Grout Pond Site Repairs in Stratton, VT. This project involves the reconstruction and improvement of approximately 4,200 feet of the Pond Loop Trail at Grout Pond Campground, along with optional items for enhanced access routes. This is a Total Small Business Set-Aside. Quotations are due by April 28, 2026, at 3:00 PM ET.
Scope of Work
The primary objective is to improve access to campsites by resurfacing and enhancing drainage on the Pond Loop Trail. Base Bid Tasks include:
- Construction of 275 feet of new aggregate surface trail.
- Restoration and resurfacing of 3,700 feet of existing trail.
- Reconstruction of 500 feet of trail turnpiking.
- Installation of a 7'x14' glulam deck bridge. Optional Items (A-D), awarded based on funding availability, include:
- Construction of a 17-step overlapping stone staircase.
- Construction of improved access routes to various campsites and privies (Sites 1-3 & Privy 1; Sites 4-6,8 & Privy 2; Sites 9-11 & Privy 3), including obliteration of existing routes.
Contract Details & Timeline
- Contract Type: Request for Quotation (RFQ)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS: 237999 (Maintenance Of Recreation Facilities (Non Building)) with a $45.0M size standard.
- Period of Performance: May 1, 2026, to September 30, 2026.
- Quote Due Date: April 28, 2026, at 3:00 PM ET.
- Published Date: April 20, 2026.
Key Amendments & Clarifications
- Amendment 2 extended the quote due date and incorporated a Revised Schedule of Items (Attachment 2 REVISED) and Questions & Answers document.
- The Q&A document provides clarifications on railing specifications, stairway construction (adding a pay item), culvert pipe (adding a pay item), and aggregate usage.
- Amendment 1 updated the Period of Performance and incorporated additional terms and conditions.
- Technical specifications for trail construction have been modified (Attachment 5).
- A Wage Determination (VT20260064 for Windham County, VT) applies, requiring compliance with prevailing wage rates and Executive Orders 13706 (paid sick leave) and 13658 (minimum wage).
Submission Requirements
Quotations are requested in accordance with FAR Part 12. Offerors must submit unit prices on the Revised Schedule of Items. A performance and payment bond is required within 10 calendar days after award. Offers must remain valid for at least 90 calendar days.
Contacts
- Primary: Paula Sales (paula.sales@usda.gov)
- Secondary: Brad Higley (bradley.higley@usda.gov)