GAOA Grout Pond Site Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture, Forest Service is seeking quotations for GAOA Grout Pond Site Repairs at the Green Mountain National Forest in Stratton, VT. This project involves the reconstruction and improvement of the Pond Loop Trail and associated access routes. This acquisition is a Total Small Business Set-Aside. Quotations are due by May 1, 2026, at 12:00 PM ET.
Scope of Work
This project entails the reconstruction of approximately 4,200 feet of the Pond Loop Trail at Grout Pond Campground. The base bid includes:
- Construction of 275 feet of new aggregate surface trail.
- Restoration and resurfacing of 3,700 feet of existing trail.
- Reconstruction of 500 feet of trail turnpiking.
- Installation of a 7'x14' glulam deck bridge.
Optional items, awarded based on funding availability, include constructing improved access routes to existing campsites and privies, which involve excavation, trail obliteration, clearing, grubbing, aggregate, geotextile, seeding, and straw mulch. A stone staircase is also an optional item.
Contract Details
- Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 237999 - Maintenance Of Recreation Facilities (Non Building)
- Size Standard: $45.0 Million
- Period of Performance: May 1, 2026, to September 30, 2026.
- Place of Performance: Stratton, VT.
Key Documents & Amendments
The solicitation has undergone several amendments:
- Amendment 1 updated the Period of Performance.
- Amendment 2 incorporated a revised Schedule of Items and Questions & Answers, and extended the quote due date to April 28, 2026.
- Amendment 3 further extended the quote due date to May 1, 2026, at 12:00 PM ET, and incorporated the latest revised Schedule of Items (dated 4/28/2026).
Bidders must refer to the Attachment 2 Schedule of Items REVISED4.28.2026.xlsx for specific line items, estimated quantities, and to input their unit prices. Technical specifications are detailed in Attachment 4 Grout Pond Trail Specs.pdf and Attachment 5 Grout Pond Supp Specs.pdf, which includes significant modifications to general provisions, scope, control of work, acceptance, measurement, and payment sections. Detailed engineering plans are provided in Attachment 6 Grout Pond Plans.pdf. A wage determination for Windham County, VT, is available in Attachment 7 Wage Determination.pdf.
Submission Requirements
Quotations must be submitted by May 1, 2026, at 12:00 PM ET. The original solicitation (12445526Q0038 Grout Pond Site Repairs.pdf) indicates that offers must be submitted in original and one copy, with envelopes marked with the offeror's name, address, solicitation number, and due date/time. Offers must be valid for at least 90 calendar days, and a performance and payment bond is required within 10 calendar days after award.
Contact Information
For inquiries, contact Paula Sales (paula.sales@usda.gov) or Brad Higley (bradley.higley@usda.gov).