Z--GAOA MELSTONE DAM RECONSTRUCTION

SOL #: 140L0625R0012Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
NATIONAL OPERATIONS CENTER
DENVER, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Sep 23, 2025
2
Last Updated
Feb 11, 2026
3
Submission Deadline
Feb 18, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Land Management (BLM), National Operations Center, has issued a Solicitation for the GAOA Melstone Dam Reconstruction project. This opportunity is a Total Small Business Set-Aside for the repair or alteration of dams. The project involves comprehensive reconstruction efforts at the Melstone Dam in Montana. Proposals are due by February 18, 2026, at 2:00 PM MT.

Scope of Work

This project entails the full reconstruction of the Melstone Dam. Key requirements include general construction, extensive sitework (demolition, clearing, dewatering, earth dam construction, riprap, geosynthetics, diversion, and outlet works), concrete work, metal fabrications, and restoration. Additionally, the scope includes the construction of approximately 367 rods of new 4-wire fence and the removal of about 230 rods of existing fencing, with detailed specifications for materials and installation. Technical specifications, drawings, and a geotechnical data report are provided as attachments.

Contract Details

This is a Firm Fixed-Price (FFP), Single Award Construction Contract. The estimated FAR Magnitude is between $1 Million and $5 Million. The Period of Performance is 300 calendar days after the Notice to Proceed (NTP). The work will be performed in Musselshell County, Montana. The applicable NAICS code is 237990 (Other Heavy and Civil Engineering Construction) with a size standard of $45.0 Million.

Submission & Evaluation

Award will be based on a Best Value Continuum Tradeoff Process, considering the technical proposal, past performance, and price. Non-price factors (technical and past performance) are approximately equal in importance when combined and compared to price. Offerors must submit a proposal conforming to all solicitation documents, including pricing for all line items detailed in the provided price schedule. A bid guarantee of 20% of the bid price or $3,000,000 (whichever is less) is required. The prime contractor must perform at least 15% of the cost of the contract, excluding materials. Payment requests must be submitted electronically via the Invoice Processing Platform (IPP).

Key Dates & Actions

  • Site Visit: January 29, 2026, at 10:00 am MST at Melstone Dam. RSVP is required by January 28, 2026, to jhelm@blm.gov and lmckeon@blm.gov.
  • Questions Due: February 4, 2026, at 2:00 pm MST. Submit questions to lmckeon@blm.gov.
  • Past Performance Questionnaire Due: January 7, 2026.
  • Proposal Due Date: February 18, 2026, at 2:00 PM MT.

Additional Notes

This solicitation has undergone several amendments. The latest amendment (0004) established the current site visit, questions, and proposal due dates, superseding previous postponements. Offerors must ensure they are referencing the most current version of the solicitation and all amendments. Wage Determination MT20250077 applies, outlining minimum wage rates for heavy construction in Montana.

People

Points of Contact

McKeon, LisaPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Feb 11, 2026
View
Version 7
Solicitation
Posted: Feb 9, 2026
View
Version 6Viewing
Solicitation
Posted: Jan 22, 2026
Version 5
Solicitation
Posted: Dec 2, 2025
View
Version 4
Solicitation
Posted: Nov 21, 2025
View
Version 3
Solicitation
Posted: Nov 21, 2025
View
Version 2
Solicitation
Posted: Oct 7, 2025
View
Version 1
Solicitation
Posted: Sep 23, 2025
View