GAOA North Zone Housing Repairs: Generator and Battery Replacement

SOL #: 1240BH26Q0011Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
WALLOWA WHITMAN NATIONAL FOREST
BAKER CITY, OR, 97814, United States

Place of Performance

OR

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 31, 2026
2
Last Updated
May 13, 2026
3
Submission Deadline
Apr 28, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, Wallowa Whitman National Forest is seeking quotations for GAOA North Zone Housing Repairs: Generator and Battery Replacement at the Wallowa Mountains Ranger District in Oregon. This Total Small Business Set-Aside opportunity involves replacing off-grid electrical systems. Bidders are instructed NOT to submit quotes until revised specifications for base pay items are posted.

Scope of Work

This project requires the removal and replacement of existing off-grid electrical systems. Key components include:

  • Battery Storage: Replace the existing system with a new Lithium Iron Phosphate system (700 Ahr, 33kwhr) capable of communicating with the SolArk 15k LV charge controller.
  • Backup Generator: Replace the existing 28kW propane generator with a new 28kW propane unit featuring autostart compatibility with the SolArk controller. The new generator must match existing voltages (120/208V | 52A and 240/416V | 26A).
  • Photovoltaic Collectors (Optional): Remove, dispose of, and replace two existing 2400 Watt PV array systems, including racking and wiring. This includes testing and potential replacement of individual panels. Existing mounting poles will be reused.
  • Removed Item: The optional Well Pump Electrical Generator (Item 1004) has been removed from the solicitation.
  • Other Requirements: All equipment must be cleaned of weeds and seeds before entering the National Forest, and special care is required to prevent water contamination. All materials and equipment must be new.

Contract Details

  • Type: Combined Synopsis/Solicitation (RFQ), Firm-Fixed Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 238210 (Small Business Size Standard: $19 million).
  • Period of Performance: Work must commence within 14 calendar days of the Notice to Proceed and be completed within 60 days. The estimated start date is May 4, 2026.
  • Place of Performance: Wallowa Mountains Ranger District, Oregon.

Submission & Evaluation

  • Current Status: Do not submit a quote until new documents with revised specifications for base pay items are posted on SAM.gov.
  • Submission Method (once re-opened): Via email to darcy.rapoza@usda.gov.
  • Required Documents (once re-opened): Signed SF 1442, Attachment 1 (Schedule of Items), Attachment 5 (Response to Evaluation Criteria, including Attachment 7 – Past Performance Form), and acknowledgement of solicitation amendments (via signed SF-30s).
  • Evaluation: Award will be made to the offeror representing the best value to the Government, following a Lowest Price Technically Acceptable (LPTA) methodology. Evaluation factors include Price, Technical Acceptability (experience, skills, licensing), and Past Performance.
  • Response Date (currently on hold): April 28, 2026, 1600 Pacific Daylight Time.

Contact Information

People

Points of Contact

Darcy J RapozaPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Award Notice
Posted: May 13, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 31, 2026
View