Gator Kawasaki MX - Okinawa, JP
SOL #: FA527026Q0004Combined Synopsis/Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Air Force
FA5270 18 CONS PK
APO, AP, 96368-5199, United States
Place of Performance
Kadena AB, JP-47, Japan
NAICS
Automotive Oil Change and Lubrication Shops (811191)
PSC
Maintenance, Repair And Rebuilding Of Equipment: Ground Effect Vehicles, Motor Vehicles, Trailers, And Cycles (J023)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Feb 23, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 20, 2026, 3:00 AM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, 718th Aircraft Maintenance Squadron, requires Quarterly and Annual Maintenance Services for four (4) Gator Kawasaki UTVs located at Kadena Air Base, Okinawa, Japan. This is a Combined Synopsis/Solicitation for a firm-fixed-price contract. Quotations are due by March 20, 2026, at 1200 hours JST.
Scope of Work
The contractor will provide all personnel, tools, materials, and supervision for preventative maintenance and minor repairs on four Kawasaki UTVs (models KAT1000A and KAT820B variants, including MULE PRO-FXT 1000, model year 2024). Services include:
- Quarterly Maintenance: Greasing/lubing, oil/fluid changes, and basic inspection of brakes and safety items.
- Annual Maintenance: Full engine oil change, filter replacements (engine, fuel, air, hydraulic), inspection of hoses/connections, front final gear case and transmission case oil change, and a full inspection of vehicle safety items.
- The contractor is responsible for providing parts and fluids for routine servicing and replacement. Costs for labor and parts for non-routine repairs, incurred after inspection and requiring government approval, will be paid by the government.
- Maintenance services can be coordinated across multiple locations within Kadena Air Base, including the flight line, with the contractor escorting vehicles as needed.
Contract Details
- Contract Type: Firm-Fixed-Price.
- Period of Performance: A one-year base period (April 1, 2026 - March 31, 2027) with four subsequent one-year option periods.
- Set-Aside: This acquisition is UNRESTRICTED.
- Product Service Code (PSC): J023 - Maintenance, Repair And Rebuilding Of Equipment: Ground Effect Vehicles, Motor Vehicles, Trailers, And Cycles.
- NAICS Code: 811191 (Automotive Repair and Maintenance, General), with a size standard of $11,000,000.00.
Submission & Evaluation
- Award Basis: Lowest Price Technically Acceptable (LPTA).
- Quotation Requirements:
- A firm-fixed price for the base year and each of the four option years.
- A brief description of the company’s experience repairing vehicles or similar equipment.
- Submission: All quotations must be submitted via email to SrA Austin Robey (austin.robey@us.af.mil) and 2d Lt. Brandon Campbell (brandon.campbell.5@us.af.mil). The solicitation number (e8c09984369b41db8981b9fbaf4869a5) must be included in the email subject line.
- Response Due: March 20, 2026, at 1200 hours JST.
Special Requirements & Notes
- Contractor employees require identification badges and base access, which may include a background check.
- Compliance with contract safety requirements, OSHA 2206, Japan Environmental Governing Standards (JEGS), and Japanese Road Laws is mandatory.
- Vehicles must be inspected and insured according to Japanese Compulsory Insurance (JCI) requirements.
- An amendment added a Questions & Answers sheet (MULE QnA) clarifying scope and responsibilities.
People
Points of Contact
Brandon CampbellPRIMARY
Austin RobeySECONDARY
Files
Versions
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 23, 2026