Ground Based Radar Digitization (GBRD)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The United States Space Force (USSF) is issuing a Request for Information (RFI) for the Ground Based Radar Digitization (GBRD) program. This RFI seeks industry input on modernizing legacy Ground Based Radars (GBR) to enhance battlespace situational awareness, reduce sustainment costs, and address obsolescence. Responses are due April 1, 2026.
Purpose & Background
This RFI is for information and planning purposes only and does not constitute a solicitation. The USSF aims to digitize six radar sites (5x Upgraded Early Warning Radars - UEWR, 1x Perimeter Acquisition Radar Attack Characterization System - PARCS) to improve space domain awareness, missile warning, missile defense, and missile tracking capabilities. The program targets Initial Operational Capability (IOC) by 2028 (UEWR) and 2029 (PARCS), with Full Operational Capability (FOC) for all six sites by 2030.
Key Interests & Technical Focus
The USSF is particularly interested in solutions that leverage open system, non-proprietary architectures, utilize Commercial Off-The-Shelf (COTS) technology, and incorporate existing, developed digital receiver technology as the baseline. Input is sought on technical capabilities for digitizing analog radar systems, modular open architectures, cybersecurity compliance, and sustainment strategies to reduce lifecycle costs and address diminishing manufacturing sources.
Acquisition Strategy
The acquisition strategy is under development, considering a Middle Tier Acquisition (MTA) pathway and Other Transaction Authority (OTA) for prototyping the first two sites (one UEWR and PARCS), followed by a production contract for the remaining four UEWR sites. The USSF is also exploring innovative contracting mechanisms to engage non-traditional defense contractors, including academia and small businesses.
Information Requested
Respondents should provide a Company Overview, proposed Technical Solutions (including performance improvements and digital receiver integration), Sustainment and Lifecycle Management strategies, Contracting Recommendations, Schedule and Cost Estimates, and details on Non-Traditional Contractor Engagement.
Submission Details
Responses must be submitted in PDF format, not exceeding 20 pages, by April 1, 2026. This RFI does not commit the Government to contract for any supply or service, and all costs incurred in responding are at the interested party's expense.
Additional Notes
A draft Request for Prototype Proposal (RPP) document has been released, outlining a potential future prototyping phase with specific deadlines (e.g., RPP Materials Due: March 16, 2026). An Industry Day Presentation (August 2025) and Q&A document (August 2025) provide further context, confirming GBRD as a new requirement with no incumbent and emphasizing goals like open architecture and COTS. A list of interested vendors is also available. Contact: Tracy Anderson (tracy.anderson.4@spaceforce.mil).