Grounds Maintenance Services, West Hill Dam, Uxbridge, MA

SOL #: W912WJ26QA068Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW ENGLAND
CONCORD, MA, 01742-2751, United States

Place of Performance

Place of performance not available

NAICS

Landscaping Services (561730)

PSC

Landscaping/Groundskeeping Services (S208)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 6, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 6, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), New England District, is soliciting proposals for Grounds Maintenance Services at the West Hill Dam Project in Uxbridge, MA, and the Wolf Hill Dike and Sutton St. Gage Station in Northbridge, MA. This is a Total Small Business Set-Aside opportunity. The proposal submission deadline is April 6, 2026, at 2:00 PM Eastern.

Scope of Work

The work requires furnishing all equipment, materials, and labor for comprehensive grounds maintenance. Key tasks include:

  • West Hill Dam/Park: Approximately 9 acres of weekly fine lawn mowing, trimming, and grounds cleaning from May through October.
  • Wolf Hill Dike and Sutton St. Gage Station: Approximately 0.25 acres of bi-weekly rough mowing, trimming, and grounds cleaning from May through October.
  • Services must adhere to the Performance Work Statement (PWS), U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1), and all applicable OSHA, federal, state, and local safety requirements.
  • Contractors must prepare and submit an Accident Prevention Plan (APP), Activity Hazard Analysis (AHA), and designate a Site Safety and Health Officer (SSHO). The SSHO may also serve as the working supervisor or crew lead if all requirements are met.
  • Trimming services are required in conjunction with mowing and will not be priced as standalone events.
  • Bulk refuse receptacles for trash and litter removal will be provided on-site by the Government.
  • Contractors are responsible for surveying the area and reporting any damage or vandalism prior to commencing work; unreported damage will be assumed contractor-caused.
  • No government space or facilities will be provided for equipment storage.

Contract Details

  • Type: Firm Fixed Price Solicitation (RFQ)
  • Period of Performance: A base year from May 1, 2026, to April 30, 2027, with two available option years.
  • NAICS Code: 561730 (Landscaping Services)
  • Size Standard: $9.5 Million
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5). This acquisition is not specifically for service-disabled veteran-owned or women-owned small businesses.

Submission & Evaluation

  • Offer Due Date: April 6, 2026, at 2:00 PM Eastern.
  • Submission Method: Quotes must be submitted via email to the Contract Specialist, Jennifer M. Samela.
  • Evaluation Factors: Technical capability, Price, and Past Performance.
  • Mandatory Requirements:
    • Vendors must have an active registration in SAM.gov at the time of submission.
    • A mandatory solicitation survey must be completed and returned with quotes.
    • The Contractor's Project Manager and Quality Control Personnel must be physically present for the pre-work conference; virtual attendance is not permitted.
  • Site Visit: Vendors are encouraged to attend a site visit; contact Ronald Woodall to arrange.

Amendments

Two amendments have been issued. Amendment 0001 extended the proposal deadline to April 6, 2026, and clarified several PWS requirements and set-aside details. Amendment 0002 reaffirmed the extended deadline and further clarified PWS sections regarding trimming, refuse, SSHO roles, damage reporting, and pre-work conference attendance.

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 5
Award Notice
Posted: Apr 21, 2026
View
Version 4Viewing
Solicitation
Posted: Apr 6, 2026
Version 3
Solicitation
Posted: Mar 27, 2026
View
Version 2
Solicitation
Posted: Mar 23, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 6, 2026
View