GWMP MEMORIAL AVE IRRIGATION EXTENSION
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), through its Washington Contracting Office, is soliciting proposals for the GWMP Memorial Avenue Irrigation Extension and Turf Rehabilitation project. This Total Small Business Set-Aside opportunity involves installing new irrigation systems and rehabilitating turf along Memorial Avenue in Arlington, VA. The project is estimated to be valued between $250,000 and $500,000. Proposals are due by March 30, 2026, at 1700 (hour).
Scope of Work
This project focuses on extending an irrigation system and rehabilitating turf along Memorial Avenue, from the Arlington National Cemetery (ANC) property line to the Boundary Channel Bridge. Key tasks include:
- Turf Management: Removal of existing turf, offsite disposal, and laying new sod (95% Tall Fescue, 5% Kentucky Bluegrass) to match ANC specifications.
- Irrigation System Installation: Installing an in-ground irrigation system for new turf areas and a drip irrigation system for existing Holly hedges. The new system must be 100% compatible with and tie into ANC's existing Hunter Landscape Irrigation system, requiring Hunter brand components or approved equals.
- Protection & Restoration: Protecting existing infrastructure (hedges, sidewalks, curbs, roadway) and restoring any impacted areas to their original condition.
- Deliverables: Providing complete as-built plans for the new irrigation systems and sod installation, along with a utility survey and investigation for irrigation line routing.
Contract Details
- Contract Type: Firm Fixed Price.
- Estimated Value: Approximately $250,000 to $500,000.
- Period of Performance: January 20, 2026, to May 15, 2026, with work to begin within 10 calendar days of Notice to Proceed and complete within 90 calendar days.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction) with a $45 Million size standard.
- Bonds: A bid guarantee (20% of bid price, not to exceed $3M) and Performance and Payment Bonds are required.
- Wage Determination: Bidders must adhere to General Decision Number VA20260013 for prevailing wage rates in Arlington County, VA.
Submission & Evaluation
- Proposal Due Date: March 30, 2026, by 1700 (hour).
- Submission Method: Via email.
- Evaluation Process: Best Value Continuum Tradeoff Process.
- Evaluation Factors: Project Experience, Technical Approach, Key Personnel Experience, Past Performance, and Price. Non-price factors are in descending order of importance.
- Eligibility: Offerors must be registered in SAM and qualify as a small business under the specified NAICS code.
Special Requirements & Notes
- Pre-Proposal Site Visit: Scheduled for March 6, 2026.
- Key Personnel: Requires a Project Manager, Superintendent, and Safety Supervisor with at least 10 years of experience on similar projects. The Safety Supervisor must hold a current Construction Safety Manager Certification (CSMC).
- Submittals: Pre-construction submittals include qualifications, insurance, bonds, staging/logistics plan, traffic control plan, waste management plan, health and safety plan, emergency plans, and schedule.
- Brand Name Justification: A justification for other than full and open competition has been approved for the sole-source procurement of Hunter brand irrigation components due to compatibility requirements with the existing system.
- Offerors must acknowledge all solicitation amendments.