Collin Haupt (Makah) WPS and OSS

SOL #: 75H70126Q00018Combined Synopsis/Solicitation

Overview

Buyer

Health And Human Services
Indian Health Service
DIV OF ENGINEERING SVCS - SEATTLE
SEATTLE, WA, 98121, United States

Place of Performance

Neah Bay, WA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 29, 2026
2
Last Updated
Feb 18, 2026
3
Submission Deadline
Mar 18, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Indian Health Service (IHS), specifically the DIV OF ENGINEERING SVCS - SEATTLE, has issued a Request for Quote (RFQ) for the Collin Haupt (Makah) WPS and OSS project. This opportunity, a Total Small Business Set-Aside, involves the installation of an individual septic system and a water pressure system for a private residence in Neah Bay, WA. The estimated magnitude of construction is between $25,000.00 and $100,000.00. Proposals are due by March 18, 2026, at 2:00 pm CST.

Scope of Work

The project requires the contractor to install a complete individual septic system and a water pressure system. Key components include:

  • Septic System: Installation of a 4-inch PVC gravity sewage transport pipe, underground cleanout, a 1,000-gallon two-compartment concrete septic tank, a 1,000-gallon pump chamber with an effluent pump (Orenco model PF100511 or equivalent), and approximately 750 square feet of subsurface Netafilm Bioline dripline.
  • Water Pressure System: Removal of existing temporary well cap, installation of a 3/4 HP submersible pump (Goulds 10G07 or equivalent) at 162 ft depth, 162 linear feet of 1" Schedule 120 PVC drop pipe and submersible cable, a pitless adapter, metal well cap, 155 feet of 1" SCH 40 PVC water service line to the house, a variable frequency drive (Aquavar SOLO2 or equivalent) in a standalone structure, a 2-gallon pressure tank, and approximately 200 feet of electrical conduit to the home subpanel.
  • Compliance: All work must adhere to County-approved designs, IHS Technical Provisions, and local, state, and Tribal regulations, including Washington Administrative Codes (WAC) for On-site Sewage Systems, Tanks, Building Codes, Electrical Safety, and Well Construction.

Contract Details

  • Contract Type: Firm Fixed Price
  • Estimated Magnitude: $25,000.00 to $100,000.00
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction) with a size standard of $45.0 million.
  • Period of Performance: 45 calendar days from the issuance of the Notice to Proceed (NTP).
  • Place of Performance: Neah Bay, Clallam County, WA.

Submission & Evaluation

  • Proposal Submission Deadline: March 18, 2026, at 2:00 pm CST.
  • Submission Method: Electronically in PDF format via email to Robert.Miller2@ihs.gov.
  • Questions Due: No later than 7 days prior to the proposal due date (March 11, 2026).
  • Evaluation Criteria: Award will be based on price and the quoter's compliance with terms and conditions, with price being the discriminating factor.
  • Required Submissions: Offerors must submit a copy of their current septic installer license and a narrative (MS Word or PDF) stating their ability to install a water pressure system.
  • Bonds: Performance and Payment Bonds ARE required. A Bid Guarantee is NOT required.
  • Wage Determination: Compliance with U.S. Department of Labor Wage Determination WA20260081 (effective January 2, 2026) for Clallam County, WA, is mandatory.

Additional Notes

Offerors must be registered in the System for Award Management (SAM) database. A formal site visit is not applicable; contractors should contact the homeowner directly for site investigation. The contractor is responsible for obtaining all necessary permits. A pre-construction meeting is required unless waived by the COR. TERO fees do not apply.

People

Points of Contact

Robert S. MillerPRIMARY
Andrew E. HartSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
Version 1
Sources Sought
Posted: Jan 29, 2026
View
Collin Haupt (Makah) WPS and OSS | GovScope