Z--HI ADMIN SITE BUNKHOUSE ROOF REPLACEMENT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Fish and Wildlife Service (FWS) is soliciting proposals for the Kapahulu Administrative Site Building Bunkhouse Roof Replacement in Honolulu, HI. This is a Firm Fixed-Price construction project set aside for small businesses. Proposals are due February 10, 2026.
Scope of Work
The contractor will provide all labor, materials, and equipment to:
- Remove existing shingle roofing and replace it with new asphalt shingles.
- Clean and repair gutters and vents to ensure proper drainage and airflow.
- Perform spot repairs on insulation in the attic and garage areas.
- Disassemble, store, and reinstall the existing rooftop solar (PV) system, ensuring it is fully operational post-installation.
- Comply with Hawaii building codes and industry wind-resistance standards.
Contract & Timeline
- Type: Firm Fixed-Price (FFP)
- Project Magnitude: $50,000 – $150,000
- Period of Performance: February 17, 2026, to September 30, 2026
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Response Due: February 10, 2026
Evaluation
Award will be made to the responsible offeror providing the lowest evaluated price determined to be fair and reasonable. Contractors must be licensed roofing professionals and demonstrate relevant experience.
Additional Notes
Amendment 0001 provided 42 Q&A responses. Key clarifications include: no engineered drawings are provided (contractors must verify dimensions during site visits); the PV scope is limited to removal and reinstallation rather than replacement; and bonding is required (Payment Bond for awards >$35,000; Performance Bond for awards >$150,000).