Holt Lock Monolith R14 Restoration
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock. Amendment 0001 is posted 16 May 2025 to update the Table of Contents, Bid Schedule, Explanation of Bid Schedule, and several sections within the specifications as well as drawings. The response date has been extended to 4 June 2025.