ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), under the Department of Transportation, is soliciting proposals for the Custer Motorway Stabilization Project (Solicitation No. 69056725R000008) in Challis, ID. This is a Firm Fixed-Price Task Order Contract under the existing Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC) IDIQ. The project is estimated to be between $700,000 and $2,000,000. Proposals are due January 29, 2026.
Scope of Work
This project involves bank stabilization, reinforced soil slope construction, and roadway resurfacing at two sites along the Custer Motorway (Mile Post 24.0 and Mile Post 25.3) within the Salmon-Challis National Forest. The work addresses erosion and shallow slope failures caused by Mill Creek scour. Key deliverables include:
- Construction of Reinforced Soil Slopes (RSS) over riprap revetment.
- Bank stabilization using buried log revetments, root wads, and fish passage boulders.
- Temporary stream diversion, erosion control, and planting.
- Implementation of temporary traffic control measures.
The project is divided into two bid schedules:
- Schedule A: Focuses on work at MP 25.3 (0.04 miles).
- Schedule B: Includes all work from Schedule A plus additional work at MP 24.0 (0.10 miles).
Contract & Timeline
- Contract Type: Firm Fixed-Price Task Order Contract.
- Estimated Value: $700,000 to $2,000,000.
- Period of Performance: Schedule A completion by July 22, 2026; Schedule B completion by October 29, 2026. Notice to Proceed expected March 23, 2026.
- Proposal Due Date: January 29, 2026.
- Questions Due: January 22, 2026.
Eligibility & Evaluation
This solicitation is restricted to existing IDIQ holders under the Idaho, Montana, and Surrounding Areas MATOC. Proposals will be evaluated based on lowest price. Large businesses must submit an acceptable subcontracting plan prior to award. A bid bond is required.
Key Updates & Notes
- Amendment A001 (Jan 13, 2026): Updated the Davis-Bacon General Wage Decision Number to ID20260078 and revised sections on electronic documentation, Masterworks, Contractor's Daily Record, Measurement of Work, Pricing Adjustments, and Progress Payments. The proposal due date was not extended.
- Q&A (Jan 20, 2026): Clarified that bidders must provide pricing for both Schedule A and Schedule B, but only one schedule will ultimately be awarded.
- Printed proposals are required; electronic bids are not accepted. Offerors must acknowledge Amendment A001 with their offer.
- Site viewing may be difficult due to snow; no show-me tours will be available.