INITIAL OUTFITTING and TRANSITION SERVICES for 120th Adjutant General Battalion Reception Complex Phase 2 Immunization Center and Optical Fabrication Laboratory, Ft. Jackson, SC.

SOL #: PANHES26P0000027986Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2V6 USA ENG SPT CTR HUNTSVIL
REDSTONE ARSENAL, AL, 35898-0000, United States

Place of Performance

Place of performance not available

NAICS

Process (541614)

PSC

Program Management/Support Services (R408)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 3, 2026
2
Last Updated
Mar 13, 2026
3
Response Deadline
Mar 19, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army has issued a Presolicitation for Initial Outfitting and Transition Services for the 120th Adjutant General Battalion Reception Complex Phase 2 Immunization Center and Optical Fabrication Laboratory at Ft. Jackson, SC. This opportunity is restricted to current IO/T MATOC holders with contracts under CEHNC (W912DY) and is not open to the public. A pre-bid site visit is scheduled for March 10, 2026, at 0830.

Scope of Work

This effort involves providing Initial Outfitting and Transition (IO/T) services for the specified facilities. Further details regarding the scope are available in the Draft Performance Work Statement.

Eligibility & Participation

Participation is strictly limited to contractors currently holding IO/T MATOC contracts with CEHNC (W912DY). This presolicitation is not open to the general public.

Key Dates & Actions

  • Pre-Bid Site Visit: March 10, 2026, at 0830 (Ft. Jackson, SC). This visit is for informational purposes only; no bid submissions are required at this time.
  • Response Due (for memo confirmation): March 19, 2026, at 8:00 PM EST. Contractors are requested to confirm receipt of the memorandum and its 14 attachments by this date.
  • Published Date: March 4, 2026

Additional Information

Attendance at the pre-bid site visit is limited to a maximum of two representatives per contractor. Interested eligible contractors should refer to the Draft Performance Work Statement for comprehensive details.

Agency & Contacts

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 4
Pre-Solicitation
Posted: Mar 13, 2026
View
Version 3
Pre-Solicitation
Posted: Mar 11, 2026
View
Version 2Viewing
Pre-Solicitation
Posted: Mar 4, 2026
Version 1
Pre-Solicitation
Posted: Mar 3, 2026
View
INITIAL OUTFITTING and TRANSITION SERVICES for 120th Adjutant General Battalion Reception Complex Phase 2 Immunization Center and Optical Fabrication Laboratory, Ft. Jackson, SC. | GovScope