INITIAL OUTFITTING and TRANSITION SERVICES for 120th Adjutant General Battalion Reception Complex Phase 2 Immunization Center and Optical Fabrication Laboratory, Ft. Jackson, SC.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army (DEPT OF DEFENSE), specifically W2V6 USA ENG SPT CTR HUNTSVIL, has issued a Presolicitation for INITIAL OUTFITTING and TRANSITION SERVICES for the 120th Adjutant General Battalion Reception Complex Phase 2 Immunization Center and Optical Fabrication Laboratory at Ft. Jackson, SC. This effort is restricted to current IO/T MATOC holders with contracts under CEHNC (W912DY) and is not open to the public. The response date for this presolicitation is March 19, 2026.
Scope of Work
This opportunity seeks services for the initial outfitting and transition of new facilities, including an Immunization Center and an Optical Fabrication Laboratory. The specific requirements are detailed in the Draft Performance Work Statement (PWS).
Contract & Timeline
- Type: Presolicitation
- Set-Aside: Restricted to current IO/T MATOC holders (CEHNC W912DY contracts)
- Product/Service Code: R408 (Program Management/Support Services)
- Pre-Bid Site Visit: Held on March 10, 2026, at 0830. Notes from this visit are included in Amendment 0004.
- Response Due: March 19, 2026, at 8:00 PM UTC
- Published: March 13, 2026
Amendments & Attachments
- Amendment 0004 (March 13, 2026): Incorporated Combined Questions and Answers Spreadsheet, PWS Revision 0.2 (dated March 11, 2026), Revised Jackson 120th AG Proposal Worksheet (dated March 13, 2026), Pre-Proposal Site Visit Notes (March 10, 2026), Swing Space CAD Files, OFL Building 1899 CAD Files, Existing Building 1895 Drawings, and Construction Schedule (dated Feb 8, 2026).
- Amendment 0003 (March 11, 2026): Added CEHNC Pre-proposal Site Visit Notes, Jackson Pre-Proposal Site Visit, and Reception Complex PH2 - PA13.
- Amendment 0002 (March 4, 2026): Re-emphasized that the effort is only open to current IO/T MATOC holders.
- Amendment 0001 (March 3, 2026): Added attachments including DHA Cybersecurity/Risk Management Framework (RMF) Requirements, Cybersecurity Roles and Responsibilities, Contracting Officer’s Memorandum for Record (MFR), Sample Schedule of Values and Invoice Logic Summary, Sample Customer Concurrence and Final Release Forms, ENG Form 6293 Accident Prevention Plan, and Jackson 120th AG Price Proposal Worksheet.
Additional Notes
Attendance at the past site visit was limited to two representatives per contractor. Interested parties should refer to the Draft Performance Work Statement and all amendments for complete details.