Amendment to Solicitation for Installation of Fiber Optic Cable in an Existing Protected Distribution System (PDS)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is an Amendment to a Combined Synopsis and Solicitation for the installation of fiber optic cable within an existing Protected Distribution System (PDS) at Fort Shafter, HI. The amendment provides updated details, extends key deadlines, and clarifies the scope of work. This is a Total Small Business Set-Aside.
Scope of Work
The requirement is for non-personal services to install one strand of multimode fiber optic cable within the existing secure PDS at the 413th Contracting Support Brigade, Building T122, Second Floor, Fort Shafter, HI. Key tasks include:
- Installing 130 feet of multimode fiber optic cable with specific SC, ST, and LC connectors.
- Terminating the new cable at the switch using a 1 GB GBIC.
- Permanently and securely resealing any opened PDS sections using safety-compliant methods.
- Providing certified cable test results and updated "as-built" drawings.
- Final inspection and acceptance by the Contracting Officer Representative (COR).
Contract & Timeline
- Type: Firm Fixed Price Purchase Order
- Set-Aside: Total Small Business (FAR 19.5)
- Place of Performance: Fort Shafter, HI
- Period of Performance: Not to exceed 30 days after receipt of order.
- Site Visit Extension: Until May 7, 2026 (0830 to 1600).
- Questions & Answers Deadline: May 7, 2026, 1600 Hawaii Time.
- Offer Due Date Extension: May 8, 2026, 1000 Hawaii Time.
- Final Quote Confirmation: NLT May 7, 2026, 1600.
- Published: April 30, 2026 (Amendment).
Key Clarifications & Amendments
This amendment extends the site visit and offer due dates. The Performance Work Statement (PWS) has been updated to include detailed tasks for fiber installation, termination, resealing, and testing. Previously issued Questions & Answers (Q&A) provide further clarifications on cable quantity, fiber specifications, PDS conditions, access, and invoicing. The applicable SCA labor category is 'Electronics Technician Maintenance III' at $40/hr.
Evaluation
Quotes will be evaluated for acceptability and price. Award will be made to the lowest priced quote that meets or exceeds acceptability standards for non-price factors, including technical capability and past performance. Offerors must be registered in SAM.
Contact Information
- Primary: SSG Jessica Mcneill (jessica.m.mcneill2.mil@army.mil, 8087873695)
- Secondary: SSG Mbawuike Uchechukwu (uchechukwu.mbawuike.mil@army.mil)