B2316 Steam Boiler Replacement
SOL #: FA489726Q0012Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Air Force
FA4897 366 CONS PKP
MOUNTAIN HOME AFB, ID, 83648-5296, United States
Place of Performance
ID
NAICS
Plumbing (238220)
PSC
Installation Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (N045)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Feb 26, 2026
2
Last Updated
Jun 3, 2026
3
Submission Deadline
Jun 9, 2026, 9:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, through the 366 CONS PKP office, is soliciting proposals for the B2316 Steam Boiler Replacement project at Mountain Home Air Force Base, Idaho. This Total Small Business Set-Aside opportunity requires the replacement of an existing 50 horsepower steam boiler with a new 25 horsepower unit and associated equipment in Building 2316, the Dining Facility. Proposals are due by June 9, 2026, at 3:00 PM local time.
Scope of Work
The contractor will provide all labor, materials, services, and oversight to complete the construction and installation. Key tasks include:
- Removal and disposal of the current 50 horsepower steam boiler and existing HVAC components.
- Installation of a new 25 horsepower steam boiler (e.g., Fulton ICS-25 or equivalent) and a new feedwater/condensate tank (e.g., Fulton HT-30 or equivalent) on a factory skid.
- Installation of a modulating burner, BACnet integration gateway, blowdown tank, chemical feeder kit, and water treatment system.
- Installation of a new header valve, insulation for new steam piping, and routing of drain lines to floor drains.
- Ensuring any new roof penetration is watertight and matches the current roof system. All work must adhere to current standards including UFC, IBC, IMC, IPC, IECC, NEC, NFPA, ICC, AFETL, and AFI.
Contract Details
- Contract Type: Firm Fixed Price.
- Period of Performance: 90 calendar days after Notice to Proceed.
- Set-Aside: 100% Small Business Set-Aside.
- NAICS Code: 238220 (Plumbing and Air-Conditioning Contractors) with a $19,000,000.00 annual receipts size standard.
- Bonds: Performance and Payment Bonds, each 100% of the original contract price, are required within 10 calendar days after award.
- Wage Determination: Prevailing wage rates for building construction in Idaho (including Elmore County) apply, as detailed in General Decision ID20260020.
Submission & Evaluation
- Proposals Due: June 9, 2026, at 3:00 PM local time.
- Offer Acceptance Period: Offers must be held firm for 206 calendar days from the offer due date.
- Evaluation Factors: Proposals will be evaluated based on Technical Capabilities/Experience, Past Performance, and Price.
Key Clarifications & Requirements
- Project Type: This is not a design-build project, and stamped engineered drawings are not required, clarifying an earlier SOW statement.
- Site Visit: An organized site visit was held on May 21, 2026; attendance was not mandatory for bid eligibility. No additional site visits will be scheduled.
- Site Conditions: Contractors are responsible for verifying site conditions and dimensions.
- Boiler Operation: The existing boiler is functional; continuous steam service is not required during construction, and no temporary boiler will be needed. The contractor must coordinate any necessary outages with the government.
- Environmental Protection: Bidders must adhere to detailed environmental protection measures, including submittal of an Environmental Protection Plan (EPP) and managing waste, stormwater, and natural resources.
- Base Access: Personnel requiring base access must follow procedures outlined in the 366 SFS Form 30, including submitting requests two weeks in advance.
- Submittals: Required submittals include an EPP, As-Built Drawings, recycled material weight tickets, boiler cut sheets, and Operation & Maintenance (O&M) manuals.
- Warranty: A one-year warranty from the date of final acceptance is required.
Contact Information
- Primary Contact: Caleb Ferch (caleb.ferch.1@us.af.mil)
- Secondary Contact: Natasha Lizama (natasha.lizama.1@us.af.mil)
People
Points of Contact
Caleb FerchPRIMARY
Natasha LizamaSECONDARY