Inyo National Forest (NF) Wastewater Treatment Plant (WWTP) Operations (Ops) & Maintenance (Maint)

SOL #: 127EAS26Q0006Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 2
Albuquerque, NM, 871023498, United States

Place of Performance

Lone Pine, CA

NAICS

Sewage Treatment Facilities (221320)

PSC

Maintenance Of Sewage And Waste Facilities (Z1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 19, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 19, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is seeking proposals for Wastewater Treatment Plant (WWTP) Operations & Maintenance (O&M) services for the Inyo National Forest in California. This Total Small Business Set-Aside opportunity covers comprehensive O&M, service, and repair for three WWTPs and associated collection systems. The contract is anticipated as a Firm-Fixed-Price Purchase Order for a base year and four option years. Quotations are due by 1700 PDT on March 18, 2026.

Scope of Work

The contractor will provide full operations, maintenance, service, and repair for the Bishop Creek WWTP, Rock Creek WWTP, Convict Lake WWTP, and the Eastern Sierra Visitor Center lift station. Key responsibilities include:

  • Routine, preventive, and corrective maintenance of WWTPs and collection facilities (e.g., lift stations, treatment ponds, pumps, electrical systems, sewer lines, comminutors, leach fields, septic tanks).
  • Effluent sampling and analysis coordination, ensuring compliance with Waste Discharge Requirements (WDRs).
  • Maintaining comprehensive records, including operational logs, maintenance logs, and sampling results.
  • Infrastructure assessment, reporting deficiencies, and managing wastewater sludge.
  • Ensuring continuous operation of critical components and adherence to equipment maintenance schedules.
  • Providing all necessary equipment, supplies, transportation, labor, and supervision.
  • Routine site visits: minimum four times per week for Bishop Creek and Rock Creek WWTPs, and one time per week for Convict Lake WWTP and Eastern Sierra Visitor Center lift station.
  • Adhering to all applicable federal, state, and local laws and regulations, including WWOCP regulations.

Contract Details

  • Contract Type: Firm-Fixed-Price Purchase Order.
  • Duration: One (1) base year and four (4) one-year option periods, not to exceed five (5) years and six (6) months.
  • Estimated Start Date: March 23, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 221320 – Sewage Treatment Facilities, with a $35M size standard.
  • Place of Performance: Inyo National Forest, Lone Pine, CA, specifically at the Bishop Creek, Rock Creek, Convict Lake WWTPs, and Eastern Sierra Visitor Center Lift Station.

Submission & Evaluation

  • Submission Deadline: 1700 PDT on March 18, 2026.
  • Submission Method: Electronically via email to Matthew Killian (matthew.killian@usda.gov).
  • Evaluation Criteria: Best value to the Government, based on:
    1. Technical Approach to Performing the Work.
    2. Responsibility (per FAR 9.104-1).
    3. Experience & Past Performance (requires completing Attachment 5 - Experience Questionnaire).
    4. Price (requires using Attachment 4 - Fillable Schedule of Items and providing an itemized price list).
  • Evaluation will use a comparative methodology and adjectival rating scale.
  • All offerors must have an ACTIVE registration in SAM.gov.

Key Dates & Requirements

  • Site Visit: March 4, 2026, 9:00 AM PST. Contact Matthew Killian for attendance.
  • Questions Due: March 6, 2026, 1300 PST.
  • Quotations Due: March 18, 2026, 1700 PDT.
  • Estimated Award: On or before April 3, 2026.
  • Special Requirements: Contractor must possess a California Grade 1 Wastewater Operator Certificate or higher, Confined Space Entry training, WWOCP Contract Operator Registration, and maintain specific insurance. Compliance with the Service Contract Act Wage Determination (Attachment 3) is mandatory.

People

Points of Contact

Matthew (Matt) KillianPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
View
Inyo National Forest (NF) Wastewater Treatment Plant (WWTP) Operations (Ops) & Maintenance (Maint) | GovScope