Inyo National Forest (NF) Wastewater Treatment Plant (WWTP) Operations (Ops) & Maintenance (Maint)

SOL #: 127EAS26Q0006Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 2
Albuquerque, NM, 871023498, United States

Place of Performance

Lone Pine, CA

NAICS

Sewage Treatment Facilities (221320)

PSC

Maintenance Of Sewage And Waste Facilities (Z1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 19, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 19, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is seeking proposals for Wastewater Treatment Plant (WWTP) Operations and Maintenance (O&M) services at various facilities within the Inyo National Forest, California. This Total Small Business Set-Aside opportunity covers the Bishop Creek, Rock Creek, Convict Lake WWTPs, and the Eastern Sierra Visitor Center lift station. The contract is anticipated to be a Firm-Fixed-Price Purchase Order for a base year and four option years. Quotes are due by March 18, 2026, at 5:00 PM PDT.

Scope of Work

The awarded contractor will provide comprehensive O&M, service, and repair for the specified WWTPs and associated collection systems. This includes routine, preventive, and corrective maintenance, effluent sampling and analysis coordination, sludge management, and ensuring continuous compliance with Waste Discharge Requirements (WDRs). The contractor is responsible for providing all necessary equipment, supplies, labor, and supervision. Key activities involve regular site visits (four times weekly for Bishop Creek/Rock Creek, weekly for Convict Lake/Eastern Sierra), record keeping, infrastructure assessment, and timely response to regulatory notices. The contractor must maintain specific licenses and certifications, including a California Grade 1 Wastewater Operator Certificate or higher, and WWOCP Contract Operator Registration for each WWTP.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (RFQ) for a Firm-Fixed-Price Purchase Order.
  • Duration: One (1) base year and four (4) option years, not to exceed five (5) years and six (6) months.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 221320 - Sewage Treatment Facilities (Small Business Size Standard: $35M).
  • Product Service Code: Z1ND - Maintenance Of Sewage And Waste Facilities.
  • Estimated Award: On or before April 3, 2026.

Submission & Evaluation

  • Submission Method: Electronically via email to Matthew Killian (matthew.killian@usda.gov).
  • Evaluation Criteria: Award will be based on best value considering:
    • Factor 1: Technical Approach to Performing the Work
    • Factor 2: Responsibility (per FAR 9.104-1)
    • Factor 3: Experience & Past Performance (requires Attachment 5 - Experience Questionnaire)
    • Factor 4: Price (requires Attachment 4 - Fillable Schedule of Items)
  • Requirements: Offerors must have an ACTIVE registration in SAM.gov. An itemized price list is required with Attachment 4.

Dates & Deadlines

  • Site Visit: March 4, 2026, at 9:00 AM PST, starting at Interagency Visitor Center Lift Station, Lone Pine, CA. Registration required via email to the Contracting Officer.
  • Questions Due: March 6, 2026, by 1:00 PM PST.
  • Quotations Due: March 18, 2026, by 5:00 PM PDT.

Additional Notes

Attachment 3 (Wage Determination) outlines minimum wage rates and fringe benefits. Attachment 2 provides maps and site plans for the facilities.

People

Points of Contact

Matthew (Matt) KillianPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 2
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
Inyo National Forest (NF) Wastewater Treatment Plant (WWTP) Operations (Ops) & Maintenance (Maint) | GovScope