IRS Martinsburg Enterprise Computing Center (ECC) Roof Replacement Project located in Kearneysville, WV
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The General Services Administration (GSA) is soliciting proposals for a Total Small Business Set-Aside for the IRS Martinsburg Enterprise Computing Center (ECC) Roof Replacement Project in Kearneysville, WV. This is a two-phase competitive negotiation under FAR Part 15 for a contemplated Firm-Fixed-Price contract, with an estimated value between $10,000,000 and $15,000,000. Phase 1 technical proposals are due April 16, 2026, by 2:00 PM EST.
Project Scope
The project involves the complete removal and replacement of approximately 190,000 SF of roofing across four buildings at the mission-critical, Level 5 security IRS ECC. The scope includes replacing existing protected membrane roofs (PMR), coping, flashing, expansion joints, skylights, lightning protection systems, rooftop unit structural cross bracing, and EPDM awning roofs. Additionally, new fixed exterior access ladders and a complete perimeter fall protection system will be installed. Three options (reroofing the MEP addition, installing ladders, and installing fall protection) are expected to be combined into the base bid. An add alternate for cold-fluid spray-applied waterproofing material is also included.
Contract Details
- Contract Type: Firm-Fixed-Price (contemplated)
- Estimated Value: $10,000,000 to $15,000,000
- Period of Performance: 12 months from Notice to Proceed (NTP) to Substantial Completion, with an additional 60 calendar days for Contract Completion.
- Liquidated Damages: $2,445 per calendar day for failure to achieve Substantial Completion.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Security Requirements: HSPD-12 Tier 1 clearances and PIV cards are required for all personnel.
- Bid Guarantee: Required for Phase 2, equal to 20% of the bid price or $3,000,000, whichever is less.
Procurement Process & Evaluation
This procurement uses a two-phase selection process. Phase 1 focuses on technical proposals, leading to an advisory short-list. Phase 2 will involve evaluation of price proposals, interviews, and a best value trade-off analysis. The combined weight of non-price factors is significantly more important than price.
Phase 1 Evaluation Factors:
- Factor 1 – Prior Experience on Relevant Projects (40%): Offerors must demonstrate successful experience on a minimum of three relevant projects completed in the last 10 years, each with a contract value of at least $10 million and involving re-roofing of at least 100,000 SF in a secure facility.
- Factor 2 – Project Management Plan and Approach (30%): Requires a written submission detailing the offeror's strategy for managing the project, risks, quality control, and change management.
- Factor 3 – Past Performance on Relevant Projects (30%): Evaluated using the Past Performance Questionnaire (PPQ) and other sources.
Offerors will also have the opportunity to make a Post-Submission Oral Presentation (90 minutes) to augment their written proposals, with key personnel required to attend.
Key Dates & Submission
- Phase 1 Proposal Due: April 16, 2026, by 2:00 PM EST.
- Submission Email: ching.hung@gsa.gov.
- Site Visit: A pre-proposal site visit was held on March 24, 2026. No additional pre-proposal site visits are scheduled.
- Questions (Phase 1): The deadline for questions was March 30, 2026.
- Attachments: The Solicitation, Agreement, Offeror Worksheet, Past Performance Questionnaire, and RFI Submission Form are available for download. 95% Drawings, Project Manual, and Design Narrative require special access via Google Drive (GSA GACA gmail or gmail address needed). The 100% submission will be issued as part of Phase 2.