J045--Replace Condensers & Evaporators

SOL #: 36C25726Q0272Combined Synopsis/Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
257-NETWORK CONTRACT OFFICE 17 (36C257)
San Antonio, TX, 78240, United States

Place of Performance

Place of performance not available

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Feb 27, 2026
3
Submission Deadline
Mar 3, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the 257-NETWORK CONTRACT OFFICE 17, is soliciting proposals for the replacement of condenser and evaporator units for walk-in freezer and cooler units at the Doris Miller VAMC in Waco, Texas. This opportunity is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Offers are due by March 3, 2026, at 4:00 PM CST.

Scope of Work

The contractor will provide all labor, equipment, and materials to remove existing units and install new ones. Key tasks include:

  • Removal and installation of 13 condenser units (roof-mounted on Bldg. 202) and 13 EEV-driven evaporator units (inside walk-in units).
  • Installation of new insulated copper refrigerant line sets and heat trace at all drain lines.
  • Replacement of insulation and aluminum jacketing on existing drain lines.
  • Application of 4-inch spray-applied closed cell foam insulation on specified roof areas.
  • Sealing of all cooler/freezer roof and wall penetrations.
  • Recovery and disposal of existing refrigerant and all removed equipment in accordance with EPA regulations.
  • Compliance with International Building Code (IBC), National Electrical Code (NEC), ASHRAE, VA Specifications/Standards, and local facility requirements.
  • Contractor must provide all necessary barriers, signage, and safety equipment.
  • OSHA 30-hour construction worker course for on-site competent person and OSHA 10-hour for other workers.
  • Attachment A details existing units, requiring verification of BTU, Phase, Voltage, and Amperage, and ensuring new units meet or exceed performance.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (36C25726Q0272)
  • Period of Performance: 60 days from contract award.
  • Product Service Code: J045 (Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment)
  • NAICS Code: 238220
  • Size Standard: 238220
  • Wage Determination: Service Contract Act WD 2015-5261, Revision No. 28, applies to work in Falls and McLennan Counties, Texas.

Submission & Evaluation

  • Offer Due Date: March 3, 2026, 4:00 PM CST.
  • Submission Method: Offers must be submitted via email to Sherine.Brooks@va.gov.
  • Evaluation: Based on Technical Capability, Past Performance, and Price using a comparative analysis best value selection process.
  • Mandatory Site Visit: February 17, 2026, at 9:00 AM CST in Bldg. 202. Point of Contact (POC): Moses Briscoe (moses.briscoe1@va.gov, 254-297-3963).
  • Technical Questions Due: February 20, 2026, 4:00 PM CST, via email to Sherine.Brooks@va.gov, referencing "Technical Questions – 36C25726Q0272 Replace Walk-in Condenser & Evaporator".

Eligibility

This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Contractors must be registered in SAM.gov.

Key Contacts

People

Points of Contact

Sherine BrooksContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
View