JBR032 Alaska National Guard Readiness Center

SOL #: W911KB25R0002Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SN ENDIST ALASKA
ANCHORAGE, AK, 99506-0898, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Administrative Facilities And Service Buildings (Y1AZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 21, 2025
2
Last Updated
Jul 31, 2025
3
Submission Deadline
May 16, 2025, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This is a design-build project for a new Alaska Army National Guard Readiness Center Additions (approx. 50,641 SF) at Camp Carroll in the Ft. Richardson side of JBER, Alaska. The readiness center will be designed and constructed to support training, administrative, logistical, and operational requirements of three AKARNG units. Design and construction will include all utility services, systems, site improvements, drainage, parking areas to support the facility. Integral part of the facility will be a designated paved area for organizational (military equipment) parking/staging area. The readiness center will have a general-purpose training/maintenance bay, assembly area, controlled hazardous waste and POL storage area, a fully equipped commercial kitchen, heated storage spaces for each occupying unit, arms vault for each occupying unit, training/classrooms, secure room, and admin/office spaces. Comprehensive interior design services will be required. The readiness center will have a backup generator that will fully support continuous operation of the readiness center during a prolonged utility power interruption.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 8
Solicitation
Posted: Jul 31, 2025
View
Version 7
Solicitation
Posted: Jun 4, 2025
View
Version 6
Solicitation
Posted: May 21, 2025
View
Version 5
Solicitation
Posted: May 16, 2025
View
Version 4
Solicitation
Posted: May 15, 2025
View
Version 3Viewing
Solicitation
Posted: Apr 30, 2025
Version 2
Solicitation
Posted: Apr 16, 2025
View
Version 1
Pre-Solicitation
Posted: Mar 21, 2025
View