JBSA Lackland Remove and Replace Golf Cart Bridge

SOL #: FA301626Q0043Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3016 502 CONS CL
JBSA LACKLAND, TX, 78236-5286, United States

Place of Performance

DWG, TX

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Prefabricated Structures And Scaffolding (J054)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 23, 2026
2
Submission Deadline
Apr 9, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for the removal and replacement of the Hole 18 Golf Cart Bridge (B490) at Joint Base San Antonio (JBSA) Lackland, Texas. This is a 100% Total Small Business Set-Aside acquisition. The project requires a structurally sound, prefabricated, and ADA-compliant bridge for safe conveyance of pedestrians and golf carts. Quotes are due by April 9, 2026, at 10:00 AM CST.

Project Scope

The scope of work involves the complete removal of the existing bridge and installation of a new prefabricated steel bridge. Key requirements include:

  • Site Preparation: Removal of the old bridge, preparation of concrete abutments, installation of ADA-compliant concrete approaches, landscape shoring, and retaining wall blocks.
  • Bridge Structure: A prefabricated steel bridge, at least 8ft wide and 85’ long, with railings at least 42” high, and an 8-ton load capacity. It must feature a black preventative compound and corrosion-resistant powder-finished steel rails.
  • Bridge Decking: Pressure-treated Douglas Fir wood is acceptable.
  • Site Restoration: Daily cleanup, spreading/leveling removed soil, installing silt barriers, and restoring the worksite to its original condition.
  • Performance Period: Approximately 120 days, expected to run from April 13, 2026, to August 11, 2026.

Contract Details & Requirements

  • Contract Type: Firm Fixed Price.
  • Set-Aside: 100% Total Small Business. Offerors must be registered in SAM.
  • Place of Performance: JBSA Lackland, TX.
  • Special Requirements: Contractor-furnished equipment, compliance with base access and security regulations, environmental laws, and OSHA safety standards. A contract manager must be available during work hours and able to meet on-site within one hour.
  • Wage Determination: Bidders must adhere to Wage Determination No. 2015-5253, Revision 28, which outlines minimum wage rates and fringe benefits for the specified Texas counties.

Submission & Evaluation

  • Quote Submission Deadline: Thursday, April 9, 2026, at 10:00 AM CST.
  • Submission Method: Email quotes to Miranda Garza (miranda.garza.2@us.af.mil) and Lauren Macias (lauren.macias.1@us.af.mil).
  • Questions Deadline: Thursday, April 2, 2026, at 12:00 PM CST. Submit questions via email to the contacts above.
  • Evaluation Criteria: Award will be made to the responsible quoter whose offer is the most advantageous, based on technical acceptability and lowest price. The government intends to award without interchanges, so initial offers should contain the best terms.
  • Site Visit: A site visit is scheduled for Tuesday, March 31, 2026, at JBSA Lackland. Interested parties must request to attend by Wednesday, March 25, 2026, at 10:00 AM CST, via email to the contacts. Attendees require a valid REAL ID, vehicle registration, and insurance for base access.

Attachments

Key attachments include the Performance Work Statement (PWS), Wage Determination, and site photos, all essential for proposal preparation.

People

Points of Contact

Miranda GarzaPRIMARY
Lauren MaciasSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
JBSA Lackland Remove and Replace Golf Cart Bridge | GovScope