LC-PIER 49-INSTALL L-SHAPED FLOATING DOCK

SOL #: N4008526R0094Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Water Supply Facilities (Z1NE)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 17, 2026
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Mar 19, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically NAVFACSYSCOM MID-ATLANTIC, has issued a solicitation for the installation of an L-shaped floating dock at LC-PIER 49. This opportunity is exclusively open to contractors currently holding an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Design-Build (DB)/Design-Bid-Build (DBB) Waterfront Construction Projects in the Hampton Roads Area of Operations, Virginia (Contract Nos. N4008524D2503 - N4008524D2507). Proposals are due by March 19, 2026.

Scope of Work

The primary scope involves the installation of an L-shaped floating dock at LC-PIER 49. This project falls under the Product Service Code Z1NE (Maintenance Of Water Supply Facilities), though the description specifies dock installation.

Contract & Timeline

  • Type: Solicitation
  • Restriction: Limited to existing IDIQ MACC holders (N4008524D2503 - N4008524D2507)
  • Set-Aside: None specified (restricted by existing IDIQ)
  • Response Due: March 19, 2026, at 6:00 PM (Eastern Time)
  • Published: March 3, 2026
  • Agency: Dept Of Defense, DEPT OF THE NAVY, NAVFACSYSCOM MID-ATLANTIC

Additional Notes

There are no agency-specific policies for the definitization of equitable adjustments for change orders under construction contracts. Current data regarding timely definitization, in accordance with DFARS PGI 205.205(h)(i), is available as of the solicitation date. General resources for the PIEE Solicitation Module, including web-based training, a direct link, and registration instructions, are also provided as separate documents.

People

Points of Contact

Chirine El Kaissi JohnsonPRIMARY

Files

Files

View
View
View
View

Versions

Version 5
Solicitation
Posted: Mar 10, 2026
View
Version 4
Solicitation
Posted: Mar 6, 2026
View
Version 3Viewing
Solicitation
Posted: Mar 3, 2026
Version 2
Solicitation
Posted: Feb 26, 2026
View
Version 1
Solicitation
Posted: Feb 17, 2026
View