LC-PIER 49-INSTALL L-SHAPED FLOATING DOCK
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is issuing a solicitation for the installation of an L-shaped floating dock at LC-PIER 49. This opportunity is exclusively open to existing contractors holding an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Design-Build (DB)/Design-Bid-Build (DBB) waterfront construction projects in the Hampton Roads Area of Operations, Virginia, under contract numbers N4008524D2503 - N4008524D2507 (ML-C00082). Responses are due by March 19, 2026.
Scope of Work
This solicitation covers the installation of an L-shaped floating dock at LC-PIER 49. The project falls under the product service code Z1NE, related to Maintenance of Water Supply Facilities, though the primary work described is construction.
Contract & Timeline
- Type: Solicitation (restricted to existing MACC holders)
- Set-Aside: Not applicable; restricted competition to specific MACC holders.
- Response Due: March 19, 2026, 6:00 PM UTC
- Published: March 10, 2026, 6:57 PM UTC
- Agency: Department of the Navy, NAVFACSYSCOM MID-ATLANTIC
Eligibility
This opportunity is strictly limited to contractors currently holding an IDIQ MACC under ML-C00082, specifically contract numbers N4008524D2503 through N4008524D2507, for waterfront construction projects in the Hampton Roads Area of Operations, Virginia.
Additional Information
The solicitation includes information regarding the timely definitization of equitable adjustments for change orders under construction contracts, in accordance with DFARS PGI 205.205(h)(i). Several documents related to the PIEE Solicitation Module, including web-based training and registration instructions, are also attached.
Contact Information
For inquiries, please contact Chirine El Kaissi Johnson at chirine.elkaissijohnson.civ@us.navy.mil or 757-462-5329.