M8 Smoke Pot Inner Packing

SOL #: W519TC-26-R-A013Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

White Hall, AR

NAICS

Polystyrene Foam Product Manufacturing (326140)

PSC

Packaging And Packing Bulk Materials (8135)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 27, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 21, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Army Contracting Command - Rock Island (ACC-RI) has issued Solicitation W519TC26RA013 for the supply of M8 Smoke Pot Inner Packing to Pine Bluff Arsenal (PBA), AR. This is a 100% Small Business Set-Aside opportunity, expected to result in a five (5) year, Firm Fixed Price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) contract. Proposals will be evaluated using a Lowest Priced Technically Acceptable (LPTA) approach. Proposals are due May 21, 2026, at 1:00 PM ET.

Scope of Work & Key Requirements

The primary deliverable is the Inner Packing for M8 Smoke Pot, with a part reference number of 2000-1538: 3XUS9. The contract has a guaranteed minimum quantity of 13,500 units and a maximum quantity of 67,500 units over the five-year period. Key requirements include:

  • Preproduction Samples: Required within 30 calendar days of contract award.
  • Technical Specifications: Adherence to drawings 36-3-144 Rev D and 36-3-145 Rev A. Access to these drawings is restricted and requires certification with the US/Canada Joint Certification Program (DD Form 2345). Drawing 36-3-145 Rev A details material specifications for Expanded Plastic Packaging Resin (70/30 Polystyrene/Polyethylene Crosslinked IPN, Gray-Green).
  • Item Unique Identification and Valuation (IUID): Required per DFARS 252.211-7003.
  • Contract Data Requirements List (CDRL): Mandates submission of Test/Inspection Reports (including First Article Test and Lot Acceptance Reports) and Technical Reports (Certificate of Analysis, Material Certification) for the inner packing.

Contract Details

  • Contract Type: Firm Fixed Price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ).
  • Duration: Five (5) years, structured with a Base Period and four Ordering Periods (FY2026-FY2030).
  • Place of Performance: Pine Bluff Arsenal, White Hall, AR.
  • Delivery: FOB Destination to Pine Bluff Arsenal, AR.
  • Payment: Via Wide Area Workflow (WAWF).
  • Amendment 0001: Updated Attachment 0001 (Price Matrix) to reflect "Ordering Periods" and added clauses FAR 52.222-90 (DEI Discrimination) and DFARS 252.227-7016 (Rights in Bid or Proposal Information).

Submission & Evaluation

  • Proposal Submission Deadline: May 21, 2026, at 1:00 PM ET.
  • Questions Due: April 28, 2026, at 12:00 PM CT.
  • Proposal Validity: 240 days after receipt of final proposals.
  • Evaluation Method: Lowest Priced Technically Acceptable (LPTA).
  • Evaluation Factors:
    • Technical Factor (Volume I): Manufacturing Plan, Experience, Delivery Schedule.
    • Price Factor (Volume II): Based on the updated Price Matrix (Attachment 0001).
  • Submission: Proposals must be submitted electronically to Jennifer Edwards at jennifer.l.edwards158.civ@army.mil.

Eligibility & Set-Aside

This is a 100% Small Business Set-Aside. The applicable NAICS code is 326140 with a size standard of 1000 employees. Offerors must be registered in the System for Award Management (SAM).

Points of Contact

People

Points of Contact

Jennifer L. EdwardsPRIMARY
Michelle LundSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: May 6, 2026
Version 3
Solicitation
Posted: Apr 20, 2026
View
Version 2
Solicitation
Posted: Apr 20, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 27, 2026
View