MAGTFTC MCAGCC; Twentynine Palms, CA; Repair conveyor and sorting belts request

SOL #: M0068126Q0043Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
COMMANDING GENERAL
CAMP PENDLETON, CA, 92055-5001, United States

Place of Performance

Twentynine Palms, CA

NAICS

Other Building Equipment Contractors (238290)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Materials Handling Equipment (J039)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 12, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 25, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically the Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, CA, is soliciting quotes for the repair of a Summit Conveyor, Model SB48-30. This Total Small Business Set-Aside opportunity aims to restore the conveyor system at the Recycling Yard to full operational capability. Quotes are due by March 25, 2026, 08:00 AM Local Time.

Scope of Work

The contractor shall provide all necessary labor, materials, supervision, equipment, tools, transportation, and incidentals to restore the conveyor system. Key tasks include:

  • Replace the existing loading belt with one meeting or exceeding OEM specifications.
  • Repair the existing sorting belt to full functional condition.
  • Align, tension, and adjust both belts.
  • Perform operational testing, including a minimum two-hour continuous test under normal load conditions, to verify system functionality without malfunctions, vibrations, slippage, or misalignment. A site visit is required prior to work to verify belt dimensions, conveyor condition, and access requirements.

Deliverables

  • Fully installed and operational loading belt.
  • Fully repaired and functional sorting belt.
  • Successful completion of operational testing.
  • Clean and restored work area.

Contract & Timeline

  • Contract Type: Firm Fixed Price.
  • Period of Performance: Work shall not exceed thirty (30) calendar days from the date of contract award. The overall delivery period is from March 27, 2026 to April 27, 2026, with the period of performance extending to May 27, 2026.
  • Place of Performance: Environmental Affairs Recycling Yard, Rifle Range Road, Marine Corps Air Ground Combat Center, Twentynine Palms, CA 92278.
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
  • Quotes Due: March 25, 2026, 08:00 AM Local Time.
  • Published: March 12, 2026.

Submission & Evaluation

  • Submission Method: Quotes must be submitted via email only to Jaren L. Perkins (jaren.l.perkins@usmc.mil). Mailed, faxed, CD/External Media, or hand-carried submissions will not be accepted.
  • Evaluation Factors: Technical Capability and Past Performance (combined approximately equal to price), and Price.
    • Technical Approach: Quoters must provide a specific, detailed narrative demonstrating understanding of requirements and how deliverables will be accomplished.
    • Past Performance: Quoters must provide recent (within 3 years), relevant, and quality past performance examples (up to 5) related to manufacturing and repair services.
    • Price: Must be fair, reasonable, and balanced.
  • The Government reserves the right to award without discussions or make no award.

Additional Notes

  • Offerors must be registered in the System for Award Management (SAM).
  • Quotes must be valid for 90 days.
  • Late submissions will not be accepted.
  • A minimum twelve (12) month warranty on all parts and labor is required from the date of Government acceptance.
  • Contractor personnel must comply with installation access requirements and safety/environmental regulations.

People

Points of Contact

Jaren PerkinsPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 2
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
MAGTFTC MCAGCC; Twentynine Palms, CA; Repair conveyor and sorting belts request | GovScope