Maintain Pavement Markings

SOL #: FA660626B0001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA6606 439 CONF PK
WESTOVER AFB, MA, 01022-1508, United States

Place of Performance

Chicopee, MA

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Airport Runways And Taxiways (Z2BD)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 17, 2026
2
Last Updated
Mar 13, 2026
3
Submission Deadline
Apr 8, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically the 439 CONF PK office, has issued Solicitation FA6606-26-B-0001 for Maintaining Pavement Markings at Westover Air Reserve Base in Chicopee, MA. This is a Total Small Business Set-Aside for a Firm Fixed-Price (FFP) construction project estimated between $300,000.00 and $500,000.00. The project involves comprehensive airfield pavement marking, rubber removal, and friction testing. Bids are due by April 8, 2026, at 2:00 PM EDT.

Scope of Work

The contractor will furnish all labor, materials, equipment, and services to maintain airfield pavement markings. Key tasks include:

  • Runway Markings: Painting white retro-reflective markings on Runway 05/23 and non-reflective on Runway 15/33, including centerlines, edge lines, thresholds, and designation numbers. Old markings will be removed via water-blasting. Friction testing is required for Runway 05/23 (before and after rubber removal), but not for Runway 15/33.
  • Taxiway Markings: Painting yellow retro-reflective centerlines and hold positions, and non-reflective markings for other features on specific taxiways (F, G, L, N, P, R, S, T, & Y). Old markings will be removed.
  • Apron, Pad, and Ramp Markings: Various markings such as aircraft taxi lines, hold positions, parking spots, equipment boxes, restricted area lines (red, non-reflective), and fuel pit markings.
  • Rubber & Paint Removal: Removal of 85% of rubber and paint buildup from designated areas without damaging pavement surfaces, at specified rates (e.g., 10,000 sq ft/hr for rubber, 1,000 sq ft/hr for paint).
  • Friction Testing: Conduct friction testing and analysis on runway surfaces using FAA-approved Certified Friction Measuring Equipment (CFME) in accordance with FAA AC 150/5320-12C and ETL 04-10.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP) construction contract.
  • Estimated Magnitude: Between $300,000.00 and $500,000.00.
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237310 (Highway, Street, and Bridge Construction) with a size standard of $45.0 Million.
  • Period of Performance: 60 calendar days from Notice to Proceed (NTP). Work must commence within 10 calendar days of NTP, with on-site completion within 30 calendar days.
  • Bonds: Performance and Payment Bonds are required. Bid guarantee is 20% of bid price or $3 Million, whichever is less.
  • Funding: Funds are not presently available; award is contingent upon fund availability.

Submission & Evaluation

  • Site Visit: Wednesday, March 18, 2026, 10:00 AM EDT (Registration due March 11, 2026).
  • RFIs/Questions Due: Wednesday, March 25, 2026, COB.
  • Bid Opening: Wednesday, April 8, 2026, 2:00 PM EDT (Registration due April 1, 2026).
  • Submission Method: Proposals must be submitted via mail or hand delivery; fax and email bids are not accepted.
  • Evaluation: Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price and price-related factors.
  • Compliance: Contractors must be certified in SAM.gov when submitting their bid. Wage Determination MA20260019 (Hampden County, MA) applies.

Special Requirements

  • Coordination: Daily coordination with the Contracting Officer and Airfield Management is critical for all work, especially runway closures and operations in controlled airfield zones.
  • Safety & Access: Strict adherence to safety regulations, use of escorts in restricted areas, constant radio contact with Air Traffic Control, and base access vetting for personnel (15 calendar days) are mandatory.
  • Materials: Compliance with Federal Specifications TT-P-1952F for waterborne paint and TT-B-1325D for retro-reflective glass beads is required. Material Safety Data Sheets (MSDS) must be submitted.
  • Environmental: Compliance with environmental protection requirements, including waste management and dust control.
  • Work Hours: Normal working hours are 0730 to 1615, Monday-Friday, with night work on active runways potentially permitted under favorable conditions with advance approval.

People

Points of Contact

Joshua BelliveauPRIMARY
Amy F. DumaisSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Mar 13, 2026
Version 2
Solicitation
Posted: Mar 4, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 17, 2026
View
Maintain Pavement Markings | GovScope