maintenance of Eaton/Cooper Switches and Transformers

SOL #: 80NSSC26930323QCombined Synopsis/Solicitation

Overview

Buyer

National Aeronautics And Space Administration
National Aeronautics And Space Administration
NASA SHARED SERVICES CENTER
STENNIS SPACE CENTER, MS, 39529, United States

Place of Performance

Stennis Space Center, MS

NAICS

Electronic and Precision Equipment Repair and Maintenance (811210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 13, 2026
2
Submission Deadline
Apr 17, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Aeronautics and Space Administration (NASA), through its NASA Shared Services Center, has issued a Combined Synopsis/Solicitation (Request for Quotation - RFQ) for the maintenance of Eaton/Cooper Switches and Transformers at Building 9325, National Center for Critical Information Processing and Storage (NCCIPS) Complex, Stennis Space Center, MS. This opportunity is a Total Small Business Set-Aside. Quotes are due by April 17, 2026, at 4:00 p.m. CT.

Scope of Work

The requirement, detailed in the Statement of Work (SOW), involves comprehensive maintenance services for Eaton/Cooper Switches and Transformers. Key tasks include:

  • Dissolved Gas Analysis (DGA) Testing: Baseline fluid testing for 57 Pad Mount Transformers and 23 Pad Mount Switchgears, providing standardized reports.
  • Leak Inspection: Inspection of 3 Pad Mount Transformers and 5 Pad Mount Switchgears for nitrogen leaks, including repair recommendations and pressure gauge verification.
  • Fluid Replacement: Replacement of fluid in one (1) Pad Mount Switchgear with approved E200 fluid, including tank inspection and repair.
  • Corrosive Deterioration (Rust) Recommendation: Inspection of one (1) Pad Mount Transformer for rust and recommendations for mitigation, including gasket replacement.
  • Nitrogen Recharge: Performance of nitrogen recharge for specified transformers and switchgears post-service.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP) project.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 811210 (Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components).
  • Period of Performance: Date of Award through September 30, 2026.
  • Place of Performance: Building 9325, NCCIPS Complex, Stennis Space Center, MS 39529.
  • Principal Period of Maintenance: Monday through Friday, 7 AM to 5 PM local time.
  • Quotes Due: April 17, 2026, at 4:00 p.m. CT.
  • Questions Due: April 15, 2026, at 4:00 p.m. CT (via email only; telephone questions will not be accepted).
  • Quote Validity: 30 days.

Security & Special Requirements

  • Security: U.S. citizenship is required for access to the NASA Stennis Space Center and NCCIPS data center. All subcontract personnel require NCCIPS escort. Site Visit Requests (SVR) are mandatory. Photography/video and cellular hotspots are prohibited without coordination.
  • Pricing: Shall not include labor for un-covered testing services or replacement of failed equipment; these require separate procurement.
  • Equipment: Contractor must use new equipment only.
  • Coordination: Services must be coordinated with the government's technical representative five working days in advance.
  • Reporting: An electronic report summarizing service, findings, and recommendations is required after each service visit.
  • Payment Schedule: 80% of total contract value for Fluid Sampling/External Sample Valve Install/Leak Repairs; 20% for Delivery and NCCIPS approval of Fluid Sampling Reports.

Submission & Evaluation

  • Submission Method: Quotes must be submitted via email to Lindsey McLellan at lindsey.m.mclellan@nasa.gov.
  • Quote Content: Submitted quotes must list two points of contact (name, phone number, email address).
  • Award Basis: Lowest Price Technically Acceptable (LPTA). Offers not deemed technically acceptable will be removed from consideration.
  • Eligibility: Offerors must be registered at www.sam.gov to be considered for award.

People

Points of Contact

Lindsey McLellanPRIMARY

Files

Files

Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
maintenance of Eaton/Cooper Switches and Transformers | GovScope