maintenance of Eaton/Cooper Switches and Transformers

SOL #: 80NSSC26930323QCombined Synopsis/Solicitation

Overview

Buyer

National Aeronautics And Space Administration
National Aeronautics And Space Administration
NASA SHARED SERVICES CENTER
STENNIS SPACE CENTER, MS, 39529, United States

Place of Performance

Stennis Space Center, MS

NAICS

Electronic and Precision Equipment Repair and Maintenance (811210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
May 14, 2026
3
Submission Deadline
Apr 23, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Aeronautics and Space Administration (NASA), through its NASA Shared Services Center, is soliciting quotations for the maintenance of Eaton/Cooper Switches and Transformers at Building 9325, National Center for Critical Information Processing and Storage (NCCIPS) Complex, located at Stennis Space Center, MS. This is a Total Small Business Set-Aside. Quotations are due by April 23, 2026.

Scope of Work

This requirement involves comprehensive maintenance services for Eaton/Cooper Switches and Transformers. Key tasks include:

  • Dissolved Gas Analysis (DGA) Testing: Baseline fluid testing for 57 Pad Mount Transformers and 23 Pad Mount Switchgears, with standardized reports.
  • Leak Inspection: Inspection of 3 Pad Mount Transformers and 5 Pad Mount Switchgears for nitrogen leaks, including repair recommendations and pressure gauge verification.
  • Fluid Replacement: Replacement of fluid in one (1) Pad Mount Switchgear with approved E200 fluid, including tank inspection and repair.
  • Corrosive Deterioration (Rust) Recommendation: Inspection of one (1) Pad Mount Transformer for rust and recommendations for mitigation, including gasket replacement.
  • Nitrogen Recharge: Performing nitrogen recharge for specified equipment post-service. The period of performance is from the Date of Award through September 30, 2026, with principal maintenance hours Monday through Friday, 7 AM to 5 PM local time.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation (Request for Quotation), implying a Firm Fixed-Price contract.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 811210 (Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components).
  • Quotations Due: April 23, 2026, 4:00 p.m. CT.
  • Questions Due: April 15, 2026, 4:00 p.m. CT.
  • Published: April 20, 2026.

Evaluation & Submission

Award will be made to the responsible Offeror whose quotation, conforming to the solicitation, is the Lowest Price Technically Acceptable (LPTA). Offers not deemed technically acceptable will be removed from consideration. Quotes must be submitted via email to Lindsey McLellan (lindsey.m.mclellan@nasa.gov) and must list two points of contact. Offerors must be registered at SAM.gov.

Security & Special Requirements

U.S. citizenship is required for access to NASA Stennis Space Center and the NCCIPS data center. All subcontract personnel require NCCIPS escort, and Site Visit Requests (SVR) are mandatory. Photography, video, and cellular hotspots are prohibited without coordination. The contractor must use new equipment only, coordinate services five working days in advance, and provide an electronic report after each visit. Payment is structured with 80% for fluid sampling/leak repairs and 20% upon approval of fluid sampling reports.

People

Points of Contact

Lindsey McLellanPRIMARY

Files

Files

Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View