maintenance of Eaton/Cooper Switches and Transformers
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Aeronautics and Space Administration (NASA) Shared Services Center requires maintenance services for Eaton/Cooper Switches and Transformers at Building 9325, National Center for Critical Information Processing and Storage (NCCIPS) Complex, located at Stennis Space Center, MS. This is a Total Small Business Set-Aside opportunity, structured as a Firm Fixed Price contract. Quotes are due by May 20, 2026, at 4:00 p.m. CT.
Scope of Work
The scope encompasses comprehensive maintenance activities for electrical infrastructure. Key tasks include:
- Dissolved Gas Analysis (DGA) and Fluid Quality Testing: Baseline testing for 57 Pad Mount Transformers and 23 Pad Mount Switchgears, including analysis of gases, moisture, acid number, dielectric breakdown, and PCB/fluid condition. Standardized test reports are required.
- Leak Inspection: Inspection of 3 Pad Mount Transformers and 5 Pad Mount Switchgears for leaks, with recommendations provided.
- Fluid Replacement: Replacement of fluid in one Pad Mount Switchgear (specifically SW-08, which holds 340 gallons of E200 fluid).
- Corrosion Mitigation: Inspection and recommendations for rust mitigation on one Pad Mount Transformer.
- Nitrogen Recharge: Standard nitrogen recharge procedures following relevant services. Services must be performed during the Principal Period of Maintenance (PPM), Monday through Friday, 7 AM to 5 PM local time, using industry-standard equipment and procedures. An electronic report summarizing services, findings, and recommendations is required after each visit.
Contract Details
- Contract Type: Firm Fixed Price (FFP) project.
- Period of Performance: From the Date of Award through September 30, 2026.
- Place of Performance: NASA, Building 9325, Cypress Loop Road, Stennis Space Center, Mississippi 39529.
- Set-Aside: This procurement is a Total Small Business Set-Aside (FAR 19.5).
- Product Service Code: J059 (Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components).
- NAICS Code: 811210.
- Payment Schedule: 80% of the total contract value for Fluid Sampling/External Sample Valve Install/Leak Repairs, and 20% for Delivery and NCCIPS approval of Fluid Sampling Reports.
Submission & Evaluation
- Quote Due Date: May 20, 2026, by 4:00 p.m. CT.
- Questions Due Date: All contractual and technical questions must be submitted in writing via email to Lindsey McLellan by May 18, 2026, by 4:00 p.m. CT. Telephone questions will not be accepted.
- Submission Method: Quotes must be submitted via email to Lindsey McLellan at lindsey.m.mclellan@nasa.gov.
- Quote Validity: Quotes must remain valid for 30 days.
- Evaluation Criteria: Award will be made to the responsible Offeror whose offer is the Lowest Price Technically Acceptable (LPTA). Offers not deemed technically acceptable will be removed from consideration. Offerors must be registered at www.sam.gov and include their UEI and Cage Code on the quote.
Special Requirements
Access to the NASA Stennis Space Center and NCCIPS data center requires U.S. citizenship. All subcontract personnel require NCCIPS escort, and formal Site Visit Requests (SVRs) are necessary. Photography, videography, and cellular hotspots are prohibited within the NCCIPS complex. Scheduling of services requires coordination with the government's technical representative at least five working days prior. No more than two switches and/or two transformers may be powered down simultaneously, with NCCIPS Electrical personnel performing necessary switching. The contractor must guarantee the use of new equipment only.