J--MALU FM HVAC MAINTENANCE SVC BASE + 4 OY

SOL #: 140P5126Q0017Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
SER EAST MABO(51000)
ATLANTA, GA, 30303, United States

Place of Performance

Atlanta, GA

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (J041)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 3, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 24, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), through its SER EAST MABO office, is soliciting proposals for Heating, Ventilation, and Air-Conditioning (HVAC) Maintenance Services at the Martin Luther King, Jr. National Historic Park in Atlanta, Georgia. This opportunity is a Total Small Business Set-Aside for a Firm-Fixed Price contract covering initial commissioning, inspection, preventive maintenance, and emergency services. Quotes are due by April 24, 2026, at 1:00 PM EDT.

Scope of Work

The contractor will provide comprehensive HVAC services for various commercial buildings, including the Visitor Center, Historic Ebenezer Baptist Church (excluding non-operational units), Fire Station #6, Maintenance Shop, 445 Edgewood, and 234 Sunset Ave., as well as numerous residential buildings within the park. Services include:

  • Initial commissioning, equipment inventory, and operational evaluation.
  • Monthly inspections, lubrication, and adjustments of HVAC equipment.
  • Quarterly filter replacement and annual condenser unit cleaning.
  • 24-hour response for trouble calls.
  • Contractor is responsible for supplying belts, lubricants, and filters.
  • The contract is a standard maintenance agreement; major repairs or component replacements are typically additional costs requiring separate approval.

Contract Details

  • Contract Type: Firm-Fixed Price (FFP)
  • Period of Performance: May 01, 2026 – April 30, 2027, with four one-year option periods.
  • Set-Aside: Total Small Business (FAR 19.5)
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a $19,000,000 size standard.
  • PSC Code: J041 (Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment).

Submission & Evaluation

  • Quote Submission: Electronic submission of quotes.
  • Quote Due Date: April 24, 2026, 1:00 PM EDT.
  • Questions Due Date: April 17, 2026, 4:00 PM EDT, submitted in writing via email to edward_dingle@nps.gov.
  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA) source selection. Evaluation will consider Price, Technical Ability, and Past Performance, with Technical Ability and Past Performance combined being approximately equal to cost or price.
  • Eligibility: Offerors must be registered in SAM.gov and possess a valid Unique Entity Identifier.

Key Requirements & Notes

  • Site Visit: A site visit was scheduled for April 13, 2026, and was highly encouraged. Information from the site visit does not alter solicitation terms.
  • Wage Determination: Bidders must adhere to the Service Contract Act (SCA) Wage Determination for Georgia counties, including minimum wage rates and fringe benefits.
  • Personnel: Staff working with refrigerants must hold current certifications and comply with all Federal, State, and local regulatory requirements.
  • Safety & Insurance: Contractor must submit a site-specific safety plan and maintain required insurance, including Worker's Compensation and General Liability.
  • Reporting: Incident and failure reports are required for equipment issues.
  • Equipment List: An updated equipment list (Attachment 0008) provides a comprehensive inventory of HVAC assets, crucial for proposal development.

People

Points of Contact

Dingle, EdwardPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View