Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.

SOL #: N6247026R0015Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM ATLANTIC
NORFOLK, VA, 23508-1278, United States

Place of Performance

Portsmouth, VA

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 30, 2025
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Mar 2, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM ATLANTIC, is soliciting proposals for a Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades at the Gosport Substation within Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. This unrestricted, full and open competition opportunity is valued between $100 million and $250 million. Proposals are due March 2, 2026.

Scope of Work

This project involves comprehensive upgrades to the electrical distribution system. Key tasks include:

  • Replacing primary power service transformers and distribution switchgear.
  • Connecting to existing feeders on the Main Site distribution.
  • Modernizing the existing electric Supervisory Control and Data Acquisition (SCADA) system.
  • Demolishing Buildings 1532 and 1702.
  • Installing two microtunnel railroad crossings for electrical ductbanks. Specific brand-name components, including Schweitzer Engineering Laboratories (SEL) devices and HSQ remote terminal units (RTU) for SCADA, are required due to compatibility and critical infrastructure needs, as detailed in Justification and Approval documents.

Contract & Timeline

  • Type: Firm Fixed Price Economic Price Adjustment
  • Duration: 2190 calendar days (approximately 6 years) from Notice to Proceed
  • Estimated Value: $100,000,000 - $250,000,000
  • Set-Aside: Unrestricted, Full and Open Competition
  • NAICS: 237130 (Power and Communication Line and Related Structures Construction), Size Standard: $45 Million
  • Proposal Due: March 2, 2026, 3:00 PM local time
  • Published: February 9, 2026

Submission & Evaluation

Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) platform; Attachment H provides registration instructions. Evaluation will be based on price and five non-price factors: Construction Experience, Safety, Schedule, Small Business Participation, and Past Performance. Non-price factors are collectively more important than price. A minimum 20% total small business subcontracting requirement is mandated, to be detailed in Attachment E (Small Business Participation Commitment Document). Large businesses must also submit an Individual Small Business Subcontracting Plan (Attachment F).

Amendments & Key Information

  • Amendment 0001 added site visit information, award fee details, and answered Pre-Proposal Inquiries (PPIs).
  • Amendment 0002 further revised the solicitation and answered PPIs.
  • Amendment 0003 added a revised specification and a site visit sign-in roster. Offerors must request specifications via email and submit all PPIs to Daniel Rocha (daniel.r.rocha2.civ@us.navy.mil).

People

Points of Contact

Jennifer W. McDonaldSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 11
Solicitation
Posted: Mar 9, 2026
View
Version 10
Solicitation
Posted: Mar 5, 2026
View
Version 9
Solicitation
Posted: Feb 25, 2026
View
Version 8
Solicitation
Posted: Feb 23, 2026
View
Version 7Viewing
Solicitation
Posted: Feb 9, 2026
Version 6
Solicitation
Posted: Jan 28, 2026
View
Version 5
Solicitation
Posted: Jan 14, 2026
View
Version 4
Solicitation
Posted: Jan 13, 2026
View
Version 3
Solicitation
Posted: Jan 5, 2026
View
Version 2
Solicitation
Posted: Dec 31, 2025
View
Version 1
Solicitation
Posted: Dec 30, 2025
View