Modernize and Upgrade New Pumphouse and Substation (Long Beach VA Campus
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the RFP W912PL25BA008, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements.The project will construct a new combined pumphouse and substation followed by the demolition of the current building 125 pumphouse and substation 12A/see below. The existing pumphouse will be operational in its current location during construction. Temporary power will be provided to the Fisher House on-campus hotel during construction. The construction will be performed in phases to allow continuous operation of the existing pumphouse. This requirement will include, but will not be limited to, preparation and/or performance for, submittals, field investigations, site visits, meetings and providing construction meeting minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures and other related information and services. Based on history of VA Long Beach Campus, there is a likelihood of asbestos within the existing pumphouse.