Modernize and Upgrade New Pumphouse and Substation (Long Beach VA Campus

SOL #: W912PL25BA008Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST LOS ANGELES
LOS ANGELES, CA, 90017-3409, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 18, 2025
2
Last Updated
Jul 22, 2025
3
Submission Deadline
Jul 22, 2025, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Be advised that the Bid Abstract has been posted and is available to download on 7.22.2025 at 1600.   PIEE update 0004 is for administrative purposes only, any official amendment will be accompanied by an SF30. PIEE Update 0003 is issued to transmit the SF-30 (7 pages) for Amendment 0002 of the IFB W912PL25BA008. This is to extend the bid opening date and remove all references of bid submission through DoD Safe. Bids may only be submitted through PIEE. PIEE Update 0002 is issued to transmit the Pre-Bid Site Visit sign-in sheet (1 page) for the IFB W912PL25BA008. PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the IFB W912PL25BA008, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements. The project will construct a new combined pumphouse and substation followed by the demolition of the current building 125 pumphouse and substation 12A/see below. The existing pumphouse will be operational in its current location during construction. Temporary power will be provided to the Fisher House on-campus hotel during construction. The construction will be performed in phases to allow continuous operation of the existing pumphouse. This requirement will include, but will not be limited to, preparation and/or performance for, submittals, field investigations, site visits, meetings and providing construction meeting minutes to the COR, staff interviews, phasing/scheduling, utility shutdowns, infection control measures and other related information and services. Based on history of VA Long Beach Campus, there is a likelihood of asbestos within the existing pumphouse.

People

Points of Contact

Files

Files

Download
View
View
View
View

Versions

Version 7Viewing
Solicitation
Posted: Jul 22, 2025
Version 6
Solicitation
Posted: Jul 22, 2025
View
Version 5
Solicitation
Posted: Jul 22, 2025
View
Version 4
Solicitation
Posted: Jul 18, 2025
View
Version 3
Solicitation
Posted: Jul 2, 2025
View
Version 2
Solicitation
Posted: Jun 25, 2025
View
Version 1
Solicitation
Posted: Jun 18, 2025
View