MOF Lake Sherwood Dump Station Upgrades

SOL #: 12445526Q0023Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

WV

NAICS

Other Building Equipment Contractors (238290)

PSC

Repair Or Alteration Of Recreational Buildings (Z2FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 26, 2026
2
Last Updated
Feb 24, 2026
3
Submission Deadline
Feb 27, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service has issued a Request for Quotation (RFQ), solicitation number 12445526Q0023, for MOF Lake Sherwood Dump Station Upgrades at the Lake Sherwood Recreation Area near Neola, WV. This opportunity is a Total Small Business Set-Aside for contractors specializing in Other Building Equipment (NAICS 238290). The project involves essential repairs and upgrades to the dump station and its associated sewer line. Quotes are due by February 27, 2026, at 5:00 P.M. Eastern.

Scope of Work

The project entails commercial construction services, including:

  • Mobilization and demobilization, including erosion and sediment control.
  • Traffic control to ensure safety during operations.
  • Sewer line replacement from the dump station to the main line, including new double cleanouts, combination valves, and asphalt repair.
  • Dump station upgrades, involving the removal and replacement of water towers, associated water lines, sanitary hatch, and the dump station pad. New water lines require pressure testing, chlorination, and flushing.
  • Supply and installation of new signs and associated hardware for the dump station.
  • Note: Earlier requirements for gate supply and installation have been removed via Amendment 0001.

Contract Details

  • Type: Combined Synopsis/Solicitation (RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 238290 - Other Building Equipment Contractors (Size Standard: $22 Million)
  • PSC: Z2FB - Repair Or Alteration Of Recreational Buildings
  • Performance Period: 90 calendar days after the Notice To Proceed (NTP).
  • Place of Performance: Lake Sherwood Recreation Area, Neola, WV.

Submission & Evaluation

  • Submission Method: Email completed quotes to kevin.brown2@usda.gov.
  • Submission Deadline: February 27, 2026, at 5:00 P.M. Eastern.
  • Offer Acceptance Period: Quotes must remain firm for 90 calendar days.
  • Evaluation Criteria: Award will be made to the responsible and acceptable contractor offering the Lowest Price to the Government. Acceptability is based on compliance with the solicitation, and responsibility is determined by the Contracting Officer.
  • Pricing: Bidders must provide pricing for all items listed in the updated Attachment 2 - Schedule of Items.
  • Wage Rates: Compliance with Greenbrier County, WV Wage Rates (Attachment 6) is required.

Key Clarifications & Notes

  • Amendments: Two amendments have been issued. Amendment 0001 removed gate-related work from the Schedule of Items and Statement of Work. Amendment 0002 added an RFI Q&A document. Offerors must acknowledge receipt of all amendments.
  • Site Visit: No scheduled site visit. Vendors are encouraged to visit independently. Site-specific questions can be directed to Stephen Quattrone (Stephen.Quattrone@usda.gov), CC: Kevin.Brown2@usda.gov.
  • RFI Q&A: Clarifications include guidance on tree damage during excavation (permissible with approval), topsoil reuse, seeding requirements (not required if no existing grass), and routing the sewer line around culverts.

People

Points of Contact

Kevin BrownPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 3, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 26, 2026
View
MOF Lake Sherwood Dump Station Upgrades | GovScope