Monongahela National Forest
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Transportation, Federal Highway Administration, is soliciting sealed bids for the Monongahela National Forest Project WV ERFO FS MNGAH921 2018-1(1), Solicitation Number 693C73-26-B-000006. This project involves extensive roadway, shoulder, slope repairs, and culvert/trail bridge repairs and replacements across five counties in West Virginia. The estimated value is between $10,000,000 and $20,000,000. Bids are due April 28, 2026, at 2:00 p.m. EDT.
Scope of Work
This project addresses storm and flood damage within the Monongahela National Forest, focusing on the reconstruction of damaged roadway and trail sections, including bridge replacement and reconstruction. Work will occur on Forest Service Roads (FSRs) 86, 102, 90, 13, 18, 17, 701, 707, and various Forest Service Trails in Grant, Pocahontas, Randolph, Tucker, and Webster Counties, West Virginia. The project will be split into multiple work schedules/contract options. Key tasks include:
- Roadway, shoulder, and slope repairs.
- Repairs and replacement of culverts and trail bridges.
- Miscellaneous construction work. Detailed engineering plans, geotechnical design reports (including an addendum with scope adjustments and updated recommendations), and hydraulic analyses (for culverts, bridges, and embankments with riprap sizing) are available. Environmental commitments and mitigation measures are outlined in the Categorical Exclusion Form (NEPA).
Contract Details
- Type: Firm-Fixed-Price
- Estimated Value: $10,000,000 to $20,000,000
- NAICS Code: 237310 - Highway, Street, and Bridge Construction
- Set-Aside: UNRESTRICTED (Open to all eligible business concerns)
- Performance Period: 740 calendar days if all schedules (A, B, C) are awarded together; individual schedules have shorter durations (145, 462, 363 days).
Submission & Evaluation
- Bid Due Date: April 28, 2026, at 2:00 p.m. EDT.
- Submission Method: Electronic bids via email to EFLHD.Contracts@dot.gov. Subject line must include solicitation number, project number, and ATTN: Ms. Emily McCleary. A scanned copy of the bid bond is required.
- Evaluation: Award will be made to the responsive, responsible offeror with the lowest Evaluation Total Price of Project.
- Preferences: A 10% price evaluation preference is available for eligible HUBZone Small Business Concerns.
- Requirements: A bid guarantee (20% of bid price or $3 million, whichever is less) is required. Offerors must have an active SAM registration (FAR 52.204-7) and complete annual representations/certifications. Form VETS-4212 (FAR 52.222-37) is also required. Subcontracting plans are mandatory for "other than small business" concerns when the requirement exceeds $2,000,000.
Important Notes
Amendment 0003 incorporated FAR Clause 52.222-90, "Addressing DEI Discrimination by Federal Contractors (APR 2026)," into Section G of the solicitation. All bid documents, including plans, specifications (FP-14), and amendments, are available for download from SAM.gov. Bidders are responsible for monitoring the website for any further changes.