Y--Montezuma NWR New Multipurpose Facility

SOL #: 140FGA26R0006Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, GAOA
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Office Buildings (Y1AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 19, 2026
2
Last Updated
Apr 17, 2026
3
Submission Deadline
Apr 20, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (FWS), under the Department of the Interior, has issued Solicitation 140FGA26R0006 for the construction of a New Multipurpose Facility for the Montezuma National Wildlife Refuge (NWR) & NY Ecological Services. This opportunity is a Total Small Business Set-Aside. Offers are due by April 20, 2026, at 2:00 PM local time.

Scope of Work

This project involves the Base Building Multi-Purpose Facility Construction, along with several additive items:

  • Additive #1: Resurfacing of the Parking Area MUP and additional sidewalks.
  • Additive #2: Installation of a PV system on the South Roof.
  • Additive #3: Installation of a PV system on the North Roof.
  • Additive #4: Provision of Furniture.

Key technical specifications include detailed requirements for self-adhering sheet waterproofing (Section 07 13 16) and ground-set flagpoles (Section 10 75 16). Further clarifications cover flooring, sound absorbing wall units, emulsified asphalt coating, electric locks, HVAC system connections, and ADA restroom grab bar heights.

Contract & Timeline

  • Contract Type: Solicitation for Construction (Y1AA - Construction Of Office Buildings).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Performance Period: June 1, 2026, to November 30, 2027 (548 calendar days).
  • Funding: Contingent upon the availability of appropriated funds.
  • Bonds: Performance and payment bonds are required.

Key Clarifications & Requirements

Multiple amendments have provided significant clarifications:

  • Geotechnical Information: Two detailed geotechnical reports are available as attachments, critical for foundation design and construction planning.
  • Testing & Inspections: The contractor is responsible for all required testing and inspections, including Special Inspections, with costs to be included in the lump sum bid. Dynamic Load Testing is acceptable for steel piles if calibrated.
  • Waterproofing: A combined vapor barrier/waterproofing membrane is required for the elevator pit and foundation.
  • Prevailing Wages: Apply to labor performed "on the site of the work," specifically for systems furniture labor involved in securing it to the building.
  • Materials: No regional materials or certified wood criteria are required for rough carpentry.
  • MWBE Goals: No mandated MWBE contracting goals due to the rescission of Executive Order 11246.

Submission Details

  • Offers Due: April 20, 2026, at 2:00 PM local time.
  • Format: Submit original and 1 copy in sealed envelopes, clearly marked with the offeror's name, address, solicitation number, and offer due date/time.
  • Acceptance Period: Offers must provide at least 60 calendar days for Government acceptance.
  • Amendments: Bidders must acknowledge receipt of all amendments.
  • Contact: Questions should be directed to Ian Young at ian_a_young@fws.gov.

People

Points of Contact

Young, IanPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Solicitation
Posted: Apr 17, 2026
View
Version 9
Solicitation
Posted: Apr 10, 2026
View
Version 8
Solicitation
Posted: Apr 9, 2026
View
Version 7Viewing
Solicitation
Posted: Apr 8, 2026
Version 6
Solicitation
Posted: Apr 6, 2026
View
Version 5
Solicitation
Posted: Apr 6, 2026
View
Version 4
Solicitation
Posted: Mar 31, 2026
View
Version 3
Solicitation
Posted: Mar 23, 2026
View
Version 2
Solicitation
Posted: Mar 4, 2026
View
Version 1
Solicitation
Posted: Feb 19, 2026
View