Mount Saint Helens - Sediment Retention Structure Crest Raise
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Portland District, is executing the Mount Saint Helens Sediment Retention Structure (SRS) Crest Raise project in Toutle, WA. This heavy civil engineering effort involves raising the spillway to increase sediment storage capacity. The project magnitude is estimated between $25,000,000 and $100,000,000.
Scope of Work
The primary requirement is the construction of a spillway crest raise using Roller Compacted Concrete (RCC). Key tasks include:
- Base Requirement: A 5-foot crest raise, including site preparation, water diversion, and rock excavation for a plunge pool.
- Options: A further raise to 10 feet, decommissioning of existing outlet works, and additional excavation for a low-flow channel.
- Technical Requirements: Foundation preparation (clearing to bedrock), dental concrete placement, and compliance with strict in-water work windows.
- Personnel: Specific experience requirements apply for the Project Superintendent (10 years) and RCC Production/Placement staff.
Contract & Timeline
- Type: Firm Fixed-Price Construction
- Duration: 846 calendar days after Notice to Proceed (NTP)
- Set-Aside: Unrestricted (Full and Open Competition)
- Preference: 10% HUBZone Price Evaluation Preference
- Cybersecurity: CMMC Level 1 (Self) required per Amendment 0002
Submission & Status
Bids were opened on December 19, 2025. Recent amendments updated the Cybersecurity Maturity Model Certification (CMMC) requirements to Level 1 and provided updated Wage Determinations for Cowlitz County. Bid abstracts indicate participation from firms including Anvil Builders, Flatiron Dragados, and Michels Construction.
Additional Notes
Bidders were required to provide a 20% bid security. Technical exhibits provided include historical foundation reports (1991/2012) and 2021 inspection photos of the outlet works to inform site conditions regarding fractured rock and sediment accumulation.