MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE

SOL #: W9127N26BA004Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST PORTLAND
PORTLAND, OR, 97204-3495, United States

Place of Performance

Toutle, WA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 19, 2025
2
Last Updated
Feb 2, 2026
3
Submission Deadline
Dec 19, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), Portland District, is executing the Mount Saint Helens Sediment Retention Structure (SRS) Crest Raise project in Toutle, WA. This heavy civil engineering effort involves raising the spillway to increase sediment storage capacity. The project magnitude is estimated between $25,000,000 and $100,000,000.

Scope of Work

The primary requirement is the construction of a spillway crest raise using Roller Compacted Concrete (RCC). Key tasks include:

  • Base Requirement: A 5-foot crest raise, including site preparation, water diversion, and rock excavation for a plunge pool.
  • Options: A further raise to 10 feet, decommissioning of existing outlet works, and additional excavation for a low-flow channel.
  • Technical Requirements: Foundation preparation (clearing to bedrock), dental concrete placement, and compliance with strict in-water work windows.
  • Personnel: Specific experience requirements apply for the Project Superintendent (10 years) and RCC Production/Placement staff.

Contract & Timeline

  • Type: Firm Fixed-Price Construction
  • Duration: 846 calendar days after Notice to Proceed (NTP)
  • Set-Aside: Unrestricted (Full and Open Competition)
  • Preference: 10% HUBZone Price Evaluation Preference
  • Cybersecurity: CMMC Level 1 (Self) required per Amendment 0002

Submission & Status

Bids were opened on December 19, 2025. Recent amendments updated the Cybersecurity Maturity Model Certification (CMMC) requirements to Level 1 and provided updated Wage Determinations for Cowlitz County. Bid abstracts indicate participation from firms including Anvil Builders, Flatiron Dragados, and Michels Construction.

Additional Notes

Bidders were required to provide a 20% bid security. Technical exhibits provided include historical foundation reports (1991/2012) and 2021 inspection photos of the outlet works to inform site conditions regarding fractured rock and sediment accumulation.

People

Points of Contact

Nicole AdamsSECONDARY

Files

Files

Download
Download
Download

Versions

Version 20
Award Notice
Posted: Feb 2, 2026
View
Version 19
Award Notice
Posted: Jan 15, 2026
View
Version 18
Solicitation
Posted: Dec 19, 2025
View
Version 17
Solicitation
Posted: Dec 15, 2025
View
Version 16
Solicitation
Posted: Dec 12, 2025
View
Version 15
Solicitation
Posted: Dec 8, 2025
View
Version 14
Solicitation
Posted: Dec 5, 2025
View
Version 13
Solicitation
Posted: Dec 5, 2025
View
Version 12
Solicitation
Posted: Dec 5, 2025
View
Version 11
Solicitation
Posted: Dec 5, 2025
View
Version 10
Solicitation
Posted: Nov 20, 2025
View
Version 9
Solicitation
Posted: Nov 20, 2025
View
Version 8Viewing
Solicitation
Posted: Nov 20, 2025
Version 7
Solicitation
Posted: Nov 20, 2025
View
Version 6
Solicitation
Posted: Nov 20, 2025
View
Version 5
Solicitation
Posted: Nov 20, 2025
View
Version 4
Solicitation
Posted: Nov 20, 2025
View
Version 3
Solicitation
Posted: Nov 19, 2025
View
Version 2
Solicitation
Posted: Nov 19, 2025
View
Version 1
Solicitation
Posted: Nov 19, 2025
View