MSC SHIP REPAIR VR

SOL #: N6817126QN020Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLC SIGONELLA NAPLES OFFICE
FPO, AE, 09622-0050, United States

Place of Performance

TARANTO, Italy

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (East) Ship Repair (Including Overhauls And Conversions) Performed On Non Nuclear Propelled And Nonpropelled Ships East Of The 108th Meridian (J998)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 2, 2026
2
Last Updated
Mar 17, 2026
3
Submission Deadline
Mar 23, 2026, 8:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, through the NAVSUP FLC SIGONELLA NAPLES OFFICE, is soliciting proposals for Voyage Repair (VR) services for the MSC Ship (USNS Arctic). This Solicitation is for a Firm Fixed-Price (FFP) contract to perform essential maintenance and repairs while the vessel is in Taranto, Italy. This opportunity is Not Set-Aside. Proposals are due by March 23, 2026, at 0900 Central European Time (CET).

Scope of Work

The contractor shall prepare for and accomplish the voyage repair availability (VRA) for the USNS Arctic. The scope includes Category 'A' work items, which are definitized and require a firm fixed price. Key work items identified through amendments include:

  • Renewal of 01 level deck guardrails and deteriorated posts, including provision and installation of new support frames, clad welding, and painting to specific standards.
  • Cleaning and painting UNREP (Underway Replenishment) equipment foundations on the 02 and 04 levels, covering 1,255 square feet, with strict surface preparation and coating application requirements.
  • Electronic Technician assist to troubleshoot and repair the Ship's Shrink Wrap Machine, requiring a qualified Marine Electronic Specialist for two working days.

Offerors must account for potential growth work, absorbing up to 300 labor hours and $19,425.00 of materials within the scope. Specific technical capabilities required include a certified Marine Chemist, current ABS/IACS member welder certifications, and fall protection training.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: Not Set-Aside
  • Place of Performance: Taranto, Italy (changed from Limassol, Cyprus via Amendment 0001)
  • Period of Performance: June 15, 2026, to June 29, 2026 (for CLIN 0001 and Option Line Item 0002)
  • Response Due: March 23, 2026, at 0900 CET (extended via Amendment 0003)
  • Published Date: March 13, 2026

Evaluation

Award will be made to the Lowest Priced Technically Acceptable (LPTA) Offeror. Evaluation factors include Technical Capability (rated acceptable/unacceptable) and Price. Offerors must submit Attachment J-1, "Pricing Breakdown," detailing costs for labor, materials, travel, and other direct costs, including specific sections for Additional Government Requirements (AGR). Quote validity is 90 calendar days from the due date.

Additional Notes

Multiple amendments have been issued, updating the place of performance, adding work items, revising pricing documents, and extending the response deadline. Offerors must acknowledge all amendments. A Non-Disclosure Agreement (NDA) (Attachment J-3) is required to receive restricted technical data. An active registration in SAM.gov is mandatory for contract award.

Primary Contact: CARMELITA SAGGESE (carmelita.saggese2.ln@us.navy.mil, 011390815684210) Secondary Contact: Yarinee Tafur (yarinee.tafur.civ@us.navy.mil, 390815686019)

People

Points of Contact

CARMELITA SAGGESE 6264210 CARMELITA SAGGESE carmelita.saggese2.ln@us.navy.milPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Mar 17, 2026
View
Version 4Viewing
Solicitation
Posted: Mar 13, 2026
Version 3
Solicitation
Posted: Mar 5, 2026
View
Version 2
Solicitation
Posted: Mar 4, 2026
View
Version 1
Solicitation
Posted: Mar 2, 2026
View
MSC SHIP REPAIR VR | GovScope