Multiple Building Flooring Repairs
SOL #: N4008526R9028Combined Synopsis/Solicitation
Overview
Buyer
Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States
Place of Performance
Camp Lejeune, NC
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 27, 2026
2
Last Updated
Apr 23, 2026
3
Submission Deadline
Apr 28, 2026, 6:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for Flooring Repairs in Buildings 24, 1011, and 8 at MCB Camp Lejeune, North Carolina. This is a Total Small Business Set-Aside opportunity, specifically restricted to a pre-approved list of M&R MACC contractors. The project involves removal and replacement of carpet and vinyl cove base. Proposals are due April 28, 2026, at 2:00 PM EST.
Scope of Work
This project, identified as N40085-26-R-9028 (Project 24-0419), entails comprehensive flooring repairs. The work includes:
- Demolition of existing carpet and vinyl cove base in specified areas of Buildings 24, 1011, and 8.
- Floor preparation, including application of floor sealer for moisture control.
- Installation of new carpet tiles (Tarkett Abrasive Action 19101 Midnight Blue for Buildings 24 & 1011; Tarkett Abrasive Abrasive Action Winter Grey 19103 for Building 8) and vinyl cove base.
- The facility will remain operational throughout the construction period, requiring minimal interference with normal activities.
- Contractors are responsible for protecting personal and government property, moving furniture, and debris removal (off-base disposal).
- Asbestos-containing materials (ACM) have been identified in Buildings 8 and 1011, requiring adherence to specific safety protocols. Building 24 has no ACM records.
Contract Details
- Type: Combined Synopsis/Solicitation for a construction project.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Eligibility: Strictly limited to the following M&R MACC contractors: T.E. Davis Construction Company, Joyce & Associates Construction, Inc., Olympic Enterprises, Inc., and Quadrant Construction.
- Estimated Cost Range: Between $500,000 and $1,000,000.
- Contract Completion: 360 days after award.
- Liquidated Damages: $880 per Calendar Day.
- Bond Requirements: Bid bonds (20%) for proposals >$150K; Payment bonds for proposals >$35K. Payment/performance bonds will be requested at award.
Submission & Evaluation
- Basis for Award: Lowest Price.
- Proposal Due Date: April 28, 2026, at 2:00 PM EST.
- Information Cutoff Date: April 21, 2026.
- Site Visit: A site visit was scheduled for April 16, 2026, at 1300, meeting at Building 24.
- Proposal Acceptance Period: 60 days from receipt of offers.
- Submission: Proposals must be emailed to Edward Pelser (edward.e.pelser.civ@us.navy.mil) and Regenia D. Guest (regenia.d.guest.civ@us.navy.mil).
- Acknowledgement: Bidders must acknowledge receipt of Amendments 0001 and 0002 with their proposal.
Special Considerations
- Offerors are advised that funding is contingent, and no award will be made if funds are unavailable. No reimbursement for proposal costs.
- Contractors must comply with the "Contractor Environmental Guide" for MCB Camp Lejeune, covering environmental management, hazardous materials, and training.
- Detailed specifications for carpeting (09 68 00) and general requirements (Combined DIV 01 SPECS) are provided, including submittal requirements and performance standards.
- A Submittal Register (24M052CN Mutliple Building Flooring Project SR.pdf) outlines required documentation for project management and closeout.
People
Points of Contact
Edward PelserPRIMARY
Regenia D. GuestSECONDARY
Files
Versions
Version 5
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 27, 2026