MYR ATCT Refurbish Parking Lot

SOL #: 6973GH-26-R-00041Solicitation

Overview

Buyer

Transportation
Federal Aviation Administration
6973GH FRANCHISE ACQUISITION SVCS
OKLAHOMA CITY, OK, 73125, United States

Place of Performance

Myrtle Beach, SC

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Repair Or Alteration Of Air Traffic Control Towers (Z2BA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Nov 21, 2025
2
Last Updated
Jan 23, 2026
3
Submission Deadline
Jan 9, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA) is soliciting proposals for the refurbishment of the parking lot and site at the MYR Air Traffic Control Tower (ATCT) in Myrtle Beach, SC. This is a Firm Fixed-Price contract set aside for Total Small Businesses. The project aims to address safety hazards, drainage issues, and structural failures. Proposals are due by January 30, 2026, at 3:00 PM CT.

Scope of Work

The contractor will perform comprehensive refurbishment tasks, including:

  • Pressure washing and cleaning concrete hardscapes.
  • Milling and replacing 2" of existing asphalt at the entrance road.
  • Extending existing parking areas with new asphalt layers over a graded aggregate base course.
  • Cleaning, repairing, sealing, and striping asphalt parking surfaces.
  • Removing and replacing twenty damaged wheel stops.
  • Removing vegetation and installing a graded aggregate surface course.
  • Removing and replacing damaged concrete sidewalks and pouring new motorcycle parking areas.
  • Raising existing cable vault lids and installing new prefabricated concrete diffuser/splashpads.
  • Replacing existing aluminum canopies with larger ones featuring integrated drainage.
  • Replacing six existing wall pack light fixtures with new commercial-grade LED lights.
  • Note: Earlier scope items regarding front facade and security door replacement have been removed in the latest SOW.

Contract & Timeline

  • Contract Type: Firm Fixed-Price
  • Estimated Value: $250,000 - $500,000
  • Period of Performance: 60 days after Notice to Proceed (NTP).
  • Set-Aside: Total Small Business Set-Aside (NAICS 238990, $19M size standard).
  • Proposals Due: January 30, 2026, by 3:00 PM CT.
  • Site Visit: December 18, 2025, at 10:00 AM local time (strongly encouraged). Attendees must provide names four days prior.
  • Questions Due: One week before the closing date (January 23, 2026).

Submission & Evaluation

Offerors must submit proposals via email to Samantha.A.Pearce@faa.gov. A 20% proposal guarantee is required. Award will be made to the lowest-priced, responsible offeror whose proposal conforms to solicitation requirements, based on acceptability of non-cost/price factors. Offerors must acknowledge all amendments (0001 and 0002) to avoid being considered non-responsive. Required attachments include an Organizational Experience Questionnaire (J.3), Bid Bond, Performance Bond, and Payment Bond.

Additional Notes

  • Bonds: 100% Performance and Payment Bonds are required within 15 calendar days of contract award.
  • Registration: Contractors must be registered in SAM.gov.
  • FAA Policies: FAR references are not applicable; the FAA operates under its own Acquisition Management System (AMS).
  • Wage Determination: Wage Determination SC20250043 (11.21.2025) for heavy construction in Horry County, SC, specifies minimum wage rates and fringe benefits.
  • Clarifications: Recent Q&A clarified details on exterior wall material, lack of civil site drawings, sub-grade preparation, LED wall pack light specifications (FCC compliant), FAA escort services, and confirmed that only two cable vault lids require adjustment, not replacement.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Jan 23, 2026
View
Version 4
Solicitation
Posted: Jan 9, 2026
View
Version 3Viewing
Solicitation
Posted: Jan 2, 2026
Version 2
Solicitation
Posted: Dec 17, 2025
View
Version 1
Solicitation
Posted: Nov 21, 2025
View