N--GC26 SCADA UPS REPLACEMENT

SOL #: 140R4026R0006Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Jun 11, 2026
3
Submission Deadline
Jun 26, 2026, 1:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Reclamation, is soliciting proposals for the N--GC26 SCADA UPS REPLACEMENT project at the Glen Canyon Dam, Page, AZ. This Total Small Business Set-Aside opportunity involves the comprehensive replacement of the existing SCADA Uninterruptible Power Supply (UPS) system. Proposals are due by June 26, 2026, at 9:00 AM Eastern Time.

Scope of Work

The project requires the demolition and removal of the current SCADA UPS system and associated components, including non-reusable conduit and conductors. Contractors will then provide and install a new SCADA UPS system, which must be a brand name or equal to a Schneider Electric 480V UPS with External-Battery. The scope includes all necessary electrical modifications, terminations, labeling, testing, commissioning, and cutover to minimize downtime. Deliverables also encompass shop drawings, submittals, factory/start-up support, training for operations staff, acceptance testing, as-built documentation, O&M manuals, and warranty support. Updated specifications require the UPS to maintain at least 40 kVA output for a minimum 4-hour discharge period.

Contract Details

This is a Firm-Fixed-Price contract with an estimated magnitude between $1,000,000 and $5,000,000. The Period of Performance is 545 days from the Notice to Proceed, which includes time for submittals and UPS lead time. Construction Wage Rate Requirements (Davis-Bacon), specifically Wage Determination AZ20260007 for Coconino County, Arizona (Heavy Construction), will apply. Performance and Payment Bonds (SF 25 and SF 25A) are required.

Submission & Evaluation

This opportunity is a Total Small Business Set-Aside. Offerors must be registered in SAM.gov with a valid UEI. Proposals must be submitted electronically via email to Megan Swift (mswift@usbr.gov) by the deadline. The email subject line must be "Bureau of Reclamation Proposal: GCFD POWERPLANT UPS (SCADA EACSS) – 140R4026R0006". Award will be made using Best Value-Tradeoff evaluation procedures, considering factors such as price, technical capability, past performance, and schedule. All amendments, including the latest (Amendment 0006) which extended the due date and updated specifications, must be acknowledged with the proposal.

Key Updates & Notes

The solicitation has been amended multiple times, with the latest Amendment 0006 extending the proposal due date to June 26, 2026, and revising technical specifications for UPS discharge time and output. Previous amendments provided responses to site visit questions, updated drawings, and clarified contract details. A site visit was conducted on April 8, 2026, and related Q&A documents provide extensive clarifications on equipment, site logistics, and project execution.

People

Points of Contact

Swift, MeganPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9Viewing
Solicitation
Posted: Jun 11, 2026
Version 8
Solicitation
Posted: May 11, 2026
View
Version 7
Solicitation
Posted: Apr 23, 2026
View
Version 6
Solicitation
Posted: Apr 16, 2026
View
Version 5
Solicitation
Posted: Apr 3, 2026
View
Version 4
Solicitation
Posted: Apr 1, 2026
View
Version 3
Solicitation
Posted: Mar 27, 2026
View
Version 2
Pre-Solicitation
Posted: Mar 9, 2026
View
Version 1
Sources Sought
Posted: Jan 15, 2026
View
N--GC26 SCADA UPS REPLACEMENT | GovScope