P475 Aircraft Maintenance Hangar

SOL #: N4008526R0148Solicitation

Overview

Buyer

NORFOLK, VA, 23511-0395, United States

Place of Performance

Beaufort, SC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 22, 2025
2
Last Updated
Feb 19, 2026
3
Submission Deadline
Feb 5, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for a Design-Bid-Build (DBB) project to construct the P-475 Aircraft Maintenance Hangar at Marine Corps Air Station (MCAS) Beaufort, South Carolina. This project, valued between $100,000,000 and $250,000,000, involves extensive new construction and demolition to support F-35B Joint Strike Fighter (JSF) Training Squadron and legacy aircraft maintenance operations. Proposals are due by February 26, 2026, at 2:00 PM EST.

Scope of Work

The comprehensive scope includes the demolition of existing facilities (Hangar No. 414, Building No. 727) and the construction of a new multi-story Aircraft Maintenance Hangar, an Operational Support Facility (OSF)/Shop Annex, and a three-story parking garage with approximately 400 spaces. The hangar will feature high bay space, crew and equipment areas, administrative offices, a Special Access Program Facility (SAPF), and Secure Internet Protocol Router Network (SIPRNET) capabilities. Ancillary work covers airfield apron improvements, utilities, pavements, and fencing. The project emphasizes sustainability, adhering to High Performance and Sustainable Building (HPSB) Guiding Principles, including energy efficiency and water conservation. Specific procedures for handling hazardous materials like lead, cadmium, and chromium are also outlined.

Contract & Timeline

This is a Firm-Fixed Price (FFP) contract with an estimated magnitude of $100,000,000 to $250,000,000. The performance period is 1280 calendar days for completion, following a 15-day notice to proceed. Performance and Payment Bonds are required. A Project Labor Agreement (PLA) is mandatory for award.

Eligibility & Evaluation

This solicitation is UNRESTRICTED FOR FULL AND OPEN COMPETITION. The NAICS code is 236220 (Construction Of Miscellaneous Buildings) with a size standard of $45,000,000. Proposals will be evaluated using a tradeoff process considering both price and non-price factors. Non-price factors include Corporate Experience, Management Approach and Schedule, Safety, Past Performance, and Small Business Utilization and Participation. Technical factors (Corporate Experience, Management Approach, Safety, Small Business Utilization) are collectively approximately equal in importance to Past Performance, and the combined non-price factors are approximately equal to price.

Key Updates & Submission

Multiple amendments have been issued, providing responses to Pre-Proposal Inquiries (PPIs), revising drawings (including architectural, structural, and utility plans), and updating specifications. The latest amendment (0008) incorporated PPI responses and revised architectural drawings. Bidders must submit proposals electronically via PIEE. Access to certain drawings (Volumes 2A, 2B, and 5) requires completion of a DOD-CUI Non-Disclosure Agreement. Large businesses must also submit an Individual Small Business Subcontracting Plan.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Solicitation
Posted: Feb 19, 2026
View
Version 9
Solicitation
Posted: Feb 13, 2026
View
Version 8
Solicitation
Posted: Feb 13, 2026
View
Version 7
Solicitation
Posted: Feb 4, 2026
View
Version 6
Solicitation
Posted: Jan 27, 2026
View
Version 5
Solicitation
Posted: Jan 26, 2026
View
Version 4
Solicitation
Posted: Jan 21, 2026
View
Version 3
Solicitation
Posted: Jan 7, 2026
View
Version 2Viewing
Solicitation
Posted: Dec 22, 2025
Version 1
Solicitation
Posted: Dec 22, 2025
View